My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - MRD Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - MRD Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:23:42 PM
Creation date
7/23/2024 1:22:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
111Gi4ROUP <br />4777 W LINCOLN AVE WEST MILWAUKEE. WI 53<719 <br />414 672 4244 the mrdgroup net <br />2007 <br />Caterpillar MP 20 Plate Shear <br />1990 <br />D4 Dozer <br />2006 <br />Caterpillar 320 Excavator <br />2013 <br />Labounty CP 120 Muncher <br />2012 <br />Labounty CP80 Muncher <br />2010 <br />Labounty CP80 Muncher <br />2017 <br />Caterpillar Skid Steer Loader 242D <br />2018 <br />Caterpillar Skid Steer Loader 242D <br />2007 <br />Cat 345CL Excavator Machine <br />2016 <br />Cat 336 FL Excavator With Bucket <br />2018 <br />Kripto Klaw Bucket <br />2016 <br />Caterpillar 336F HT WITH Kripto Klaw Bucket ( $25k value <br />included ) <br />2017 <br />Liehberr LH 40 M Material handler with magnet & grapple <br />2016 <br />Dooson 35OLC-5 Excavator <br />2021 <br />Fortress FS75R Shear <br />2022 <br />FortressFC25 Shear/Cracker <br />2011 <br />Komatsu PC450LC-8 High Reach Excavator <br />PROJECTS/REFERENCES/EPERIENCE <br />1. Project: Clearwater Paper Mill <br />Neenah, Wisconsin <br />Description: Asbestos abatement of 1.2M SF Paper Mill for performing a complete <br />interior demolition and gut out of all processing and manufacturing equipment and <br />machinery leaving the client with a usable warehousing facility. Completed Jan. 2024. <br />a. Owner/Client Tom Kuber KK Integrated Logistics <br />b. Phone: (715)923-6304- <br />c. Email <br />d. Contract Value: $2.4M <br />2. Project: Kimberly Pulp & Paper Mill <br />Kimberly, Wisconsin <br />Demolition Environmental Services Recycling Asset Recovery <br />
The URL can be used to link to this page
Your browser does not support the video tag.