My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:21:50 PM
Creation date
7/23/2024 1:18:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Material Hoist Attendant — "Bell Ringer" <br />8 hours <br />Material Hoist Attendant training provides training on the roles and responsibilities of the <br />material hoist attendant (bell ringer) and inspection, operation, and maintenance procedures for <br />material hoists used on construction projects. <br />Metric Measurement in Construction <br />8 hours <br />Metric Measurement in Construction training introduces experienced CCLs and new entrants to <br />the metric system of measurements and application in the construction industry. Units of <br />measure and conversions using practical applications are covered. Participants practice real - <br />world measuring techniques in practical situations. <br />Nuclear Power Plant Worker <br />32 hours <br />Nuclear Power Plant Worker training is designed for CCLs involved in maintenance and <br />shutdown activities at nuclear power plants or whose job assignments involve unescorted entry <br />into areas controlled for radiological purposes. This program is divided into nine topics, which <br />focus on the theory, basic radiological fundamentals, and the terms CCLs must know to work <br />safely around radiological hazards. <br />Permit Required Confined Space <br />24 hours <br />Permit Required Confined Space training focuses on the identification of the different types of <br />confined spaces as well as their associated hazards. Participants receive detailed instruction on <br />rules, regulations, and procedures to be followed when entering a confined space as well as <br />methods to mitigate the associated hazards. <br />Radiation Remediation <br />24 hours <br />Radiation Remediation training provides CCLs with the information they need to work safely in <br />and around radiological contaminated sites. Hands-on training is conducted in a mock training <br />area. Respiratory protection and protective clothing and why they are required are also covered <br />in this training. <br />Respiratory Protection <br />8 hours <br />Respiratory Protection training details the correct use of respirators when airborne hazardous <br />substances are present. Topics include using exposure guides, respirator selection, proper use of <br />respirators, and OSHA respiratory protection program requirements. <br />Restoration Technician <br />8 hours <br />Restoration Technician training focuses on commercial clean-up activities associated with fire <br />and/or flood damaged structures. The Restoration Technician course is designed for <br />participants who have received previous training in hazardous waste remediation, asbestos, and <br />lead abatement as this course centers on the theory, application, and practices associated with <br />restoration projects. <br />Silica Awareness <br />8 hours <br />Silica Awareness training provides information to CCLs regarding the hazards associated with <br />work activities such as concrete sawing or stone cutting of materials, which contain silica. <br />Solar Panel Installation <br />16 hours <br />Solar Panel Installation training teaches the proper system sizing, design, prep work and <br />installation of mounting brackets for photovoltaic (PV) systems, installation of mounting <br />brackets and tubes for hot water systems and involves actual hands-on work associated with <br />roof top, side of building and ground mounted applications. <br />Underground Storage Tank Removal <br />24 hours <br />Underground Storage Tank Removal training provides CCLs with knowledge about the safe <br />removal of underground storage tanks. Trench safety, hazardous waste contaminants, and <br />personal protection are all covered in this class. <br />Construction Craft Laborer Appendix A Page 13 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.