My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:21:50 PM
Creation date
7/23/2024 1:18:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Drilling - Related Instruction for concentration(s): 2, 6 16 hours <br />The Drilling Operations program includes an introduction to drilling operations, how drilling <br />operations work (construction applications, quarry applications, hand signals, and drill strings), <br />how to operate and maintain the drill, and hands-on practice of drilling operations. <br />Asbestos Worker - Related Instruction for concentration(s): 7 40 hours <br />Asbestos Abatement Worker training prepares CCLs to work safely and productively on asbestos <br />abatement projects. The program is designed to meet or exceed Occupational Safety and Health <br />Administration and Environmental Protection Agency (EPA) training requirements under 29 <br />CFR Part 1926.1101 and 40 CFR Part 763 respectively. <br />Hazardous Waste Worker - Related Instruction for concentration(s): 7 80 hours <br />Hazardous Waste Worker training prepares CCLs to work safely and productively on hazardous <br />waste remediation projects. The program meets all Occupational Safety and Health <br />Administration training requirements under 29 CFR Part 1910.120 - Hazardous Waste <br />Operations and Emergency Response. <br />Microbial Remediation - Related Instruction for concentration(s): 7 24 hours <br />Microbial Remediaton training instructs CCLs on the health hazards, PPE requirements, and remediation <br />processes and techniques associated with the removal of mold as well as other microbial contamination. <br />Lead Abatement Worker - Related Instruction for concentration(s): 7 40 hours <br />Lead Abatement Worker training prepares CCLs to work safely and productively on lead <br />abatement projects. The course meets all Occupational Safety and Health Administration and <br />Environmental Protection Agency training requirements under 29 CFR Part 1926.62 and 40 CFR <br />Part 745.225 respectively. <br />Landscaping - Related Instruction for concentration(s): 8 40 hours <br />Landscaping training provides CCLs with the knowledge and skills they need to work as a <br />landscaper with a concentration on using environmentally -friendly techniques whenever <br />possible. Topics covered include the landscape laborer's duties; safety hazards of landscape <br />work; safe use of pesticides, herbicides and fertilizers with an emphasis on using <br />environmentally -friendly materials; controlling erosion on the jobsite; and planting and <br />maintaining sod, grass, shrubs and trees. <br />Landscape Equipment Operation - Related Instruction for concentration(s): 8 40 hours <br />Landscape Equipment Operation training teaches CCLs how to safely and productively operate a <br />skid steer, a trencher, and a mini excavator. Topics include safety, operation and maintenance <br />procedures, along with ample time devoted to hands-on practice with the equipment. <br />Brick Paver Installation - Related Instruction for concentration(s): 8 40 hours <br />Brick Paver Installation training provides CCLs with the knowledge and skills they need to install <br />walkways and patios with brick pavers. Topics covered include the hazards associated with <br />installing brick pavers; laying out the work; estimating the amount of pavers required; preparing <br />the base; cutting bricks accurately and to minimize waste; and installing pavers correctly. Ample <br />time is devoted to hands-on practice with all the job tasks. <br />Retaining Wall Installation - Related Instruction for concentration(s): 8 40 hours <br />Retaining Wall Installation training provides CCLs with the knowledge and skills they need to <br />install retaining walls for landscape work. Topics covered include the hazards associated with <br />installing a retaining wall; the different types of retaining wall materials; laying out the retaining <br />wall; estimating the amount of materials required; preparing the base; tying the wall back to the <br />bank; and correct installation techniques for retaining wall blocks and timbers. <br />Irrigation Installation - Related Instruction for concentration(s): 8 40 hours <br />Irrigation Installation training provides CCLs with the knowledge and skills they need to install <br />irrigation systems. Topics covered include an overview of irrigation systems, with a focus on identifying <br />those that best conserve water; the hazards associated with installing irrigation systems; how irrigation <br />systems are best laid out for maximum efficiency, and how to maintain irrigation systems once they are <br />installed. Ample time is devoted to hands-on practice assembling and installing an irrigation system. <br />Construction Craft Laborer Appendix A Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.