My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:21:50 PM
Creation date
7/23/2024 1:18:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
American Axle & Manufacturing <br />Detroit Manufacturing Complex Decommissioning, Decontamination & <br />Demolition <br />This project, located in Detroit, Michigan was for the sale of all assets, plant decommissioning, <br />decontamination and demolition of the 1.9M sf manufacturing facility that included the demolition of <br />a 90MW onsite Power Generating Plant. The work included asbestos abatement, universal waste <br />removal, demolition of multiple structures of varying heights and the installation of new perimeter <br />fencing to secure the site. <br />Adamo purchased the <br />project from the Owner, <br />exclusive of the land. <br />There was a fee - -� <br />paid to the Owner at <br />the outset of the project <br />with a guarantee of <br />completion with no fees <br />to the Owner. <br />The project produced <br />very little in the way of de <br />30,000 tons, were recycled and the concrete produced by the demolition was crushed <br />onsite by Adamo and used as fill in machine pits, trenches and other voids on the site. <br />The work was completed on schedule and withing budget. <br />Adamo completed all the <br />demolition with its own forces <br />and subcontracted the asbestos <br />abatement and universal waste <br />removal. We expended 20,850 <br />manhours with no recordable <br />incidents. <br />"The workmanship was <br />outstanding, and the project was <br />accomplished without incident <br />and with no interruption to our <br />current operations." <br />David Sibley — Executive Director, <br />Global Facilities Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.