Laserfiche WebLink
2. The Contractor shall be responsible for snow removal within the project limits and shall <br />coordinate with City of South Bend Public Works. The Contractor is responsible for <br />protecting his/her/its project site from excessive wear and tear during snow removal. <br />XXIII. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of ten Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall <br />govern. <br />6. See existing plans at https://tinyurl.com/DrewerysPlans <br />XXIV. M/WBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br />B. Additions: <br />1. The M/WBE Goals for this Project are <br />a. MBE 1.36%. <br />b. WBE 4.54%. <br />2. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and <br />submit with Bid Proposal <br />3. Complete FORMS MBE-2.0 Evidence of Good Faith Efforts and WBE-2.0 Evidence of <br />Good Faith Efforts and submit with Bid Proposal. <br />4. Complete FORMS MBE-2.1 MBE Contacted and WBE-2.1 WBE Contacted and submit <br />with Bid Proposal. <br />5. 'Goals should be calculated based on the Base Bid only." <br />Version 07/19/2023 Special Provisions - 9 <br />