PROJECT NAME: DREWRY'S BREWERY CLEANUP, PHASE II — BOTTLING HOUSE <br />DEMOLITION <br />ADDENDUM NO. 1 <br />Date: July 17, 2024 <br />To: All Plan Holders <br />From: Theresa Heffner, Clerk of the Board of Public Works <br />CLARIFICATIONS: <br />The Base Bid shall utilize new fill from an external source. No crushing or <br />pulverizing of existing foundations, masonry, etc. for reuse is allowed. All <br />foundations and building material must be hauled away, whether to landfill or <br />recycling facility. <br />Alternate No. 2 is a deduct alternate which will allow the Contractor to pulverize <br />or crush all existing masonry, foundations and concrete for reuse as backfill. The <br />fill must be clean, free of rebar, properly graded and properly compacted. All <br />applicable provisions of Division 200 of the INDOT Standard Specifications shall <br />apply. <br />QUESTIONS AND ANSWERS: <br />• Underneath the silos, there is a basement elevation. The basement contains <br />a lot of tires and trash that have been dumped there over time. Is it the <br />responsibility of the contractor to remove all trash and interior walls of the <br />basement elevation or will basement walls and contents/trash be left in <br />place? <br />o ANSWER: Contractor is responsible for demolition of silo, down <br />to concrete slab, only. No trash/debris removal is required. <br />• Please confirm that we are to remove the utilities only within the building <br />footprint and cap them no further than the exterior perimeter of the <br />building. <br />o ANSWER: This is confirmed. Contractor only needs to cap <br />existing utilities at the edge of the building slab. Contractor shall <br />document by way of as -built drawing what utilities were discovered <br />and capped. <br />• Is there any information showing what utilities are onsite? It would be <br />helpful to know what utilities are in the ROW next to the basement walls <br />Version 8/11/2020 <br />