Laserfiche WebLink
petition would not be approved as a minor <br />change, and therefore would have to go <br />through the rezoning procedure. <br />In addition, the site plan shows no <br />connection between Sugar Maple Lane and <br />Portage Way. In a letter dated September <br />19, 1978 to John Phair of the Holladay <br />Corporation from then City Engineer, Patrick <br />McMahon, the city indicated that Sugar Maple <br />Lane will extend from Bendix Drive to <br />Portage Way Drive. <br />