Laserfiche WebLink
12/08/2023 <br />10/09/2023 <br />Contract B -44292 <br />Date Construction Substantially Completed: 12/08/2023 <br />(The contract is sufficiently completed so that it can be used for its intended purpose.) <br />All Contract Work Complete Date <br />Pre-Final Inspection made by <br />on <br />Date Punch List Items Completed: <br />Sod Maintenance Expired on : <br />Final Inspection made by: <br />on <br />and all work was found to be satisfactory from Station to <br />Date Construction Signs and Temporary Traffic Control Devices Removed: <br />Pavement Markings (have) (have not) been placed in accordance with the IMUTCD manual or as <br />directed by the District Traffic Engineer. <br />Right-of-Way (is) (is not) clear of all encroachments. <br />Date of Last Work:12/08/2023 <br />12/06/2023 <br />12/08/2023 <br />10/13/2023 <br />00/00/0000Date Failed Material Replaced: <br />and all work was found to be satisfactory from Station <br />Pre-Final Inspection made by <br />on 12/06/2023 <br />Date Punch List Items Completed:12/08/2023 <br />Sod Maintenance Expired on :10/09/2023 <br />00/00/0000Date Failed Material Replaced: <br />Final Inspection made by: <br />on 12/08/2023 <br />(The date all items were complete, except punchlist and removal of traffic control devices.) <br />12/08/2023 <br />Report of Contract Final Inspection and <br />Indiana Department Of Transportation <br />SMIC 639 <br />Recommendation for Acceptance <br />RECOMMEND ACCEPTANCE <br />DISTRICT CONSTRUCTION ENGINEER <br />LOCAL PUBLIC AGENCY <br />*County or City signatures <br />when required (at least two). <br />* By: <br />* By: <br />* By: <br />Chris Holth, Carl Tungate, Jeremy Zalas, Adam Schell, Justin Sherman, <br />Kyle Ludlow <br />N/A <br />July 9, 2024