My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 8 to OEA - Seitz Park Reno Proj No. 117-093 – SmithGroup Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 8 to OEA - Seitz Park Reno Proj No. 117-093 – SmithGroup Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:23:04 PM
Creation date
7/9/2024 3:01:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated Dec 12, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. _8 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: Dec 12, 2017 <br />b. Owner: Board of Public Works. Citv of South Bend. Indiana <br />C. Engineer: SmithGroup Inc. (Formerly SmithGroupJJR Inc.) <br />d. Project: Seitz Park Reconstruction, South Bend Project No. 117-093 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) The scope of services is for extending construction phase services for Phase I scope <br />of work based on anticipated contractor completion date October 1, 2024. We <br />propose to extend our services through December 31, 2024 related to Gintz Drive <br />construction period. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1) Task 4 Modifications (Phase I): <br />a) The SmithGroup Team will continue to review submittals/RFIs and attend OAC <br />meetings as well as internal owner meetings. Construction site visits are <br />anticipated to happen approximately one time per month. <br />b) The SmithGroup Team participated in numerous additional coordination calls <br />beyond typical progress meetings and prepared revised drawings for Owner <br />requested design changes (noted above) that were issued as bulletins or <br />RFI/submittal responses to the construction contract documents. <br />c. For the Additional Services or the modifications to services set forth above, Owner shall <br />pay Engineer the following additional or modified compensation on an hourly not -to - <br />exceed basis: <br />1) SUBTOTAL: Task 4: Implementation — fifty-six thousand and four hundred fifty <br />dollars ($56,450.00) for additional labor and expenses. <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.