My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - WWTP Hydraulic & Clarifier Proj No. 119-069 – Arcadis US Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA - WWTP Hydraulic & Clarifier Proj No. 119-069 – Arcadis US Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:01:03 PM
Creation date
7/9/2024 3:00:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br /> <br /> <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk of Board of Public Works <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: Agenda Request – Amendment to Professional Services Agreement <br />119-069 WWTP Secondary and Disinfection Improvements <br />Amendment No. 2 (PO-0000413) <br />DATE: July 1, 2024 <br /> <br />The Division of Engineering and Division of Wastewater request the Board of Public Works <br />approval of an Amendment to a Professional Services Agreement with Arcadis US, Inc. for <br />additional engineering services related to hydraulic improvements at the Wastewater Treatment <br />Plant. <br /> <br />Project Background <br />In conjunction with Long Term Control Plan and Consent Decree objectives as well as the <br />hydraulic analysis from the 2013 Wastewater Treatment Plant Facilities Plan, the scope of work <br />for this Amendment addresses Primary Clarifier and Secondary Treatment hydraulic <br />improvements to convey 100 MGD wet weather flows through Secondary Treatment. <br /> <br />Item 1: Primary Clarifier Effluent Channel Improvements <br />This work includes the expansion of the effluent channel Parshall flumes and removes an <br />existing, non-functional flow meter that has created a restriction in the Primary effluent piping. <br /> <br />Item 2: Upsizing Secondary Clarifier Influent Pipe to Final Clarifier 6 & Final Clarifier 7 <br />This work includes the replacement of a 66-inch diameter pipe with an 84-inch diameter pipe as <br />well as structural improvements to junction chambers to carry flow from the Final Clarifier <br />Influent Channel at the Aeration Gallery to Final Clarifier 6 and Final Clarifier 7. <br /> <br />The contract amounts will change as follows: <br />Original agreement amount: $793,770.00 <br />Net change for prior amendments: $175,100.00 <br />Amendment No. 2 amount: $130,200.00 <br />Adjusted agreement amount: $1,099,090.00 <br /> <br /> <br />This project is funded through Wastewater Capital Account: 641-06-605-514-431002. <br /> <br />For questions regarding the subject agenda request, contact Jacob M. Klosinski, P.E. (Ext. <br />9496) at the Division of Engineering.
The URL can be used to link to this page
Your browser does not support the video tag.