Laserfiche WebLink
Amy Smitley(Technical Advisor)John Huston (QAQC)Ben Burroughs(Project Manager)Brett Schnur(Engineer)Joe Bartos(Engineer)Matt Hemmelgarn(Structural Engineer)Matt Palte(Structural Engineer)CAD DrafterShelly Baxter(Assistant)SubconsultantTOTAL LABOR <br />TASK DESCRIPTION HOURS COST EXPENSES TOTAL <br />PM Project Management 4 16 26 46 7,980 7,980 <br />1. Basis of Design 4 2 18 24 8 16 4 40 116 14,680 400 15,080 <br />2. 60% Design 8 2 28 76 16 28 8 80 246 30,620 30,620 <br />3. Final Design 8 2 24 40 8 24 8 80 194 22,660 22,660 <br />4. General Construction Administration 4 4 20 40 8 12 8 96 15,980 400 16,380 <br />5. Meetings and Inspections 4 24 16 4 16 64 11,390 982 12,372 <br />6. Submittals 8 24 4 16 4 56 9,230 9,230 <br />7. Record Drawings 2 8 16 8 40 74 6,610 300 6,910 <br />8 Allowance No. 1: Survey Allowance 5,000 5,000 <br />9 Industrial Treatment Evaluations 5 13 18 3,980 3,980 <br />TOTAL ESTIMATED HOURS 37 12 159 236 48 120 24 240 34 910 128,130 <br />HOURLY RATES $286 $196 $196 $138 $196 $159 $254 $29 $142 <br />TOTAL 10,582$ 2,352$ 31,164$ 32,568$ 9,408$ 19,080$ 6,096$ 7,018$ 4,828$ 128,130$ 2,082$ 130,220$ <br />ESTIMATED NOT-TO-EXCEED COMPENSATION:130,220$ <br />Estimated Compensation - ARCADIS U.S., Inc. <br />07/08/24 <br />CITY OF SOUTH BEND <br />WWTP Hydraulic Improvements Design and Construction Services <br />DIVISION OF ENVIRONMENTAL SERVICES <br />Wastewater Treatment Plant