My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - WWTP Hydraulic & Clarifier Proj No. 119-069 – Arcadis US Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA - WWTP Hydraulic & Clarifier Proj No. 119-069 – Arcadis US Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:01:03 PM
Creation date
7/9/2024 3:00:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 6 of 7 <br />Between City of South Bend and ARCADIS U.S., Inc. Project Number: 30029091 <br />AMENDMENT No. 2 <br />119-069 WWTP Secondary and Disinfection Improvements Amendment No. 2 <br /> Opinion of probable construction cost <br /> Preliminary construction schedule <br /> One electronic copy (pdf, searchable format) <br />Schedule <br />Arcadis is prepared to begin work immediately upon written authorization to proceed, which is anticipated to be no later <br />than July 2024. Design services shall be completed in sufficient time for the City to get a GMP from the guaranteed <br />savings provider and within three months from notice-to-proceed. This assumes the City will provide comments on <br />design deliverables within two weeks. It is anticipated construction will be completed within a 10-month period.
The URL can be used to link to this page
Your browser does not support the video tag.