My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - SBFD Central Fire Proj No. 124-032 – WDi Architecture, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - SBFD Central Fire Proj No. 124-032 – WDi Architecture, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:00:55 PM
Creation date
7/9/2024 3:00:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of three (3) pages, referred <br />to in and part of the Agreement between Owner and <br />Engineer for Professional Services dated May 14, 2024. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 1 <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />May 14, 2024 <br /> <br />b. <br /> <br />Owner: <br /> <br />Board of Public Works, City of South Bend <br /> <br />c. <br /> <br />Engineer: <br /> <br />WDi Architecture, Inc. <br /> <br />d. <br /> <br />Project: <br /> <br />124-032 SBFD Central Roof Replacement (Task 1) <br /> <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) ADD nuclear analysis of existing insulation to Task 1 (South Bend Fire Department <br />Central Station Roof Replacement). <br /> <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br /> <br />c. The responsibilities of Owner are modified as follows: <br /> <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br /> 1) $4,600 for nuclear analysis of existing insulation. <br /> <br />e. The schedule for rendering services is modified as follows: <br /> <br />f. Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br /> <br />5. Agreement Summary (Reference only) <br /> a. Original Agreement amount: $45,200 <br /> b. Net change for prior amendments: $__________________ <br /> c. This amendment amount: $4,600 <br /> d. Adjusted Agreement amount: $49,800 <br /> <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C.
The URL can be used to link to this page
Your browser does not support the video tag.