Laserfiche WebLink
Page 1 of 1 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, PE, Sr. Project Engineer <br /> <br />SUBJECT: Change Order No. 1 - Project No. 123-054R <br />Liberty Tower TIF Project – Parking Garage <br />DATE: 07/01/2024 <br />Change Order No. 1 for the subject project is a 34.07% change to the contract. This change <br />order addresses unforeseen conditions found during the removal and replacement of the <br />parking garage concrete, including full-depth patching, spalling repairs, and added galvanic <br />anodes. The 7th floor patio pavers were removed from the scope of the project. <br /> <br />A cost breakdown is included with this memo. <br /> <br />The majority of the cost is from the increased amount of full-depth patching and associated <br />increases in overhead costs (General Conditions). Of the 34.07% increase, 24.79% are <br />unforeseen conditions, and 9.28% is scope addition, namely additional painting. See price <br />breakdown: <br />• Original Contract Price: $1,170,220 <br />• Scope Addition: $108,650 (9.28% - less than 20% per IN Code) <br />• Unforeseen Conditions: $290,088.75 (24.79%) <br />• TOTAL: $1,568,958.75 (34.07%) <br /> <br />Budget is available for this change. <br /> <br /> <br /> <br />