Laserfiche WebLink
SAK CONSTRUCTION COMPLETED PROJECTS LIST  VP Job #Project NameOwner's Contact InformationAddressSuperintendent Project ManagerTypeCompleted DateCompleted AmountPercent CompleteFootage CompleteDiameters17108Augusta, KSSanitary Sewer Rehabilitation Basin "A"Eric Burris, City of AugustaP  316‐775‐4535eburris@augustagov.org113 E. 6th Ave.Augusta, KS 67010Jeff Hirtz Nick Pryor CIPP - KS 12/31/19 $1,790,876.45 100% 31785 6", 8", 12"18002Kansas City, MOBlue River South Areas 4 & 5 ‐ I/I Reduction Project ‐ Phase 1John Dougherty, Sub to Kissick Construction Co., Inc.P 816.363.5530 jdougherty@kissickco.com8131 Indiana Ave.Kansas City, MO 64132Danny Brown Randy Mather CIPP - KS 1/22/19 $671,936.45 100% 25791 8", 10", 12"18006St. Louis, MOHarlem‐Baden Relief Phase IV (Herbert)Mike Bates, Sub to Bates Utility Company, Inc.P  314.575.0311mbates@batesutility.net841 Westwood Ind Park Dr.Weldon Spring, MO 63304Alan Stuhlsatz Travis Jerrels CIPP - MO 2/25/19 $198,050.90 100% 2850 10", 12", 21", 27"18012Belton, MO30", 27", and 18" Interceptor LiningMichael Christopher, City of BeltonP  816.331.4331mchristopher@506 Main St. Belton, MO 64012Danny Brown Cory Street CIPP - MO 7/1/19 $1,349,041.40 100% 14298 8", 12", 18", 27", 30"18015.04Eglin Air force Base, FLASUS East Coast, OS 19597Jason Drayer, Sub to Emerald Coast Utility Services, Inc.P  850‐324‐2595Jason.Drayer@asusinc.com608 Range RoadEglin AFB, Fl 32542Brett Rae/Tyler Partridge Deborah Bartley CIPP - FL 4/14/20 $1,219,280.85 100% 32837 8", 10", 12"18021Washington, DCLow Area Trunk Sewer RehabPeter Tinubu, District of Columbia Water and Sewer AuthorityP  202‐787‐4337peter.tinubu@dcwater.com5000 Overlook Ave. SWWshington, DC 20032Chad Rusher / Josh GroteBob Quackenbush CIPP - DC 7/10/21 $8,321,837.76 100% 5550 30", 42"18022Griffith, INSanitary Interceptor Sewer ImprovementsRick Konopasek, Town of GriffithP  219.924.3838rick.konopasek@griffith.in.gov111 North Broad StGriffith, IN 46319Bill SiebertChris VogtCIPP - IN6/1/19$3,992,949.25 100%1309036", 42"18026Ladue, MOSt. Louis Country Club ‐ 8" SS CIPP LiningTim Burch, St. Louis Country ClubP  314.650.6891tim.burch@stlouiscountryclub.org400 Barnes RdSt. Louis, MO 63124Alan Stuhlsatz Travis Jerrels CIPP - MO 4/9/19 $77,508.80 100% 1002 8", 15"18028Los Angeles County, CA5105, San Jose CreekChristian Alarcon, County Sanitation Districts of Los Angeles County562.908.4288 X1621CAlarcon@lacsd.org1955 Workman Mill RoadWhittier, CA 90607James Bower Leo Calvario CIPP - CA 9/15/19 $6,195,523.95 100% 7210 21", 24", 60", 63"18029Bonner Springs, KS2018 Pipe LiningRon Wyatt, City of Bonner SpringsP  913.422.8117rwyatt@bonnersprings.orgPO Box 38205 East Second St.Bonner Springs, KS 66012Jeff Hirtz Nick Pryor CIPP - KS 3/28/19 $83,484.50 100% 3791 8"18036St. Paul, MNMetropolitan Council Contract Number 17P030, Project Number 807635 Kim Sanders, Metropolitan CouncilP  651.602.4616kimberly.sanders@metc.state.mn.us390 Robert Street NorthSaint Paul, MN 55101Jason Laney Cory Street CIPP - MN 4/1/19 $2,501,744.27 100% 3543 36", 42"18041San Antonio, TXEastern Sewershed IV, CO‐00149‐01, 17‐4527Terri Ruckstuhl, San Antonio Water SystemP  210.233.3534Terri.ruckstuhl@saws.org2800 U.S. Hwy 281 NorthP.O. Box 2449San Antonio, TX 78298James Bower Brian Ackerman CIPP - TX 7/23/19 $3,812,112.32 100% 14562 24", 27", 30", 42"18045Philadelphia, PAContract, 183129, Trenchless Sewer Rehabilitation Lining of the SS in Cobbs CreekDevndra N. Pandya, City of Philadelphia215‐685‐6352dave.pandya@phila.gov1401 JFK BoulevardPhiladelphia, PA 19102Chad Rusher Bob Quackenbush CIPP - PA 6/6/20 $6,000,562.77 100% 16930 10", 12", 15", 18", 42"18046Stockton, CAAlexandria Place Sewer Truck Line Rehabilitation (Project No. M15001)Rosa Alvarez, City of StocktonP  209.937.8134rosa.alvarez@stocktongov.com425 N El Dorado StreetStockton, CA 95202Jarmann Frazer Todd Chalk CIPP - CA 12/30/19 $4,774,606.92 100% 6058 48", 54"18048North Charleston, SCAshley Interceptor Rehab Phase 8Jarred Jones, North Charleston Sewer DistrictP  843.817.8888jarred.jones@ncsd.sc.govPO Box 630097225 Stall Rd.North Charleston, SC 29419Glenn Spears Deborah Bartley CIPP - SC 2/16/19 $2,108,847.30 100% 4644 42"18054Lawrence, KS2018 Sanitary Sewer RehabNicholas Hoyt, City of Lawrence - Utilities Dept.P  Contact Phone NumberContact Email6 East Sixth St.Lawrence, KS 66044Danny Brown Randy Mather CIPP - KS 12/19/19 $1,668,087.05 100% 64467 8", 10", 12", 15"Page 9 of 39