Laserfiche WebLink
SAK CONSTRUCTION COMPLETED PROJECTS LIST  VP Job #Project NameOwner's Contact InformationAddressSuperintendent Project ManagerTypeCompleted DateCompleted AmountPercent CompleteFootage CompleteDiameters10804.48Lake Jackson, TXShy Pond Outfall EastKevin Schneider, City of St. JosephP 816.271.4848kschneider@ci.st-joseph.mo.us915 Stratton Ridge RdClute, Texas 77531James Bower Tommy Schultz CIPP-TX 11/18/21 $150,000.00 100% 100 60"10804.49Troy, MO2022 CIPP LiningKevin Schneider, City of St. JosephP 816.271.4848kschneider@ci.st-joseph.mo.us336 Excalibur BlvdTroy, MO 63379Alan Stuhlsatz Travis Jerrels CIPP-MO 3/29/22 $109,649.00 100% 3740 8", 10"10804.50Palm Springs, FLFY - 2022 CIPP Annual I/IKevin Schneider, City of St. JosephP 816.271.4848kschneider@ci.st-joseph.mo.us2400 Kirk Rd Palm Springs, FL 33461Thomas Botti Stan Krause CIPP-FL 6/29/22 $257,851.25 100% 6989 8", 10"10804.55Pasadena, MDAnne Arundel County Public SchoolsRob Barton, Anne Arundel County Public Schools,443-770-5911mbarton@aacps.org9034 Fort Smallwood Rd. Pasadena, MD 21122 Marco Antonelli Zach Adcock CIPP-MD 12/1/22 $19,050.20 100% 172 6"12162.11WSSC, MDSligo Creek, TO #11Monet Lea,Washington Suburban Sanitary CommissionP 301.206-884214051 Sweitzer Lane Laurel, MD 20707Marco Antonelli Brandt Childs CIPP - MD 4/14/21 $3,292,765.74 100% 3894 8", 18"13042.04WSSC, MDCI5300A11, Northwest, TO# 04Monet Lea,Washington Suburban Sanitary CommissionP 301.206.803614051 Sweitzer Lane Laurel, MD 20707Chad Rusher Bob Quackenbush CIPP - MD 3/14/19 $854,805.02 100% 1461 8"13042.18WSSC, MDCI5300A11, Northwest, TO# 18Monet Lea,Washington Suburban Sanitary CommissionP 301.206.803614051 Sweitzer Lane Laurel, MD 20707Marco Antonelli Brandt Childs CIPP - MD 5/4/20 $249,412.73 100% 131 8"13042.19WSSC, MDCI5300A11, Northwest, TO# 18Monet Lea,Washington Suburban Sanitary CommissionP 301.206.803614051 Sweitzer Lane Laurel, MD 20707Marco Antonelli Farooq Ahmed CIPP - MD 6/30/21 $333,362.99 100% 1950 6", 8". 10"13109.04WSSC, MDPM5337A12, Watts Branch, TO# 04Walid HalboniWashington Suburban Sanitary CommissionP 301.206.873214051 Sweitzer Lane Laurel, MD 20707Marco Antonelli Brandt Childs CIPP - MD 9/19/20 $3,421,614.18 100% 6304 8", 27", 30"13109.12WSSC, MDPM5337A12, Watts Branch, TO# 12Walid HalboniWashington Suburban Sanitary CommissionP 301.206.8732walid.halboni@wsscwater.com14051 Sweitzer Lane Laurel, MD 20707Marco Antonelli Brandt Childs CIPP - MD 3/27/20 $1,682,243.75 100% 2551 8"13109.14WSSC, MDPM5337A12, Watts Branch, TO# 14Walid HalboniWashington Suburban Sanitary CommissionP 301.206.8732walid.halboni@wsscwater.com14051 Sweitzer Lane Laurel, MD 20707Marco Antonelli Brandt Childs CIPP - MD 6/22/20 $1,804,603.38 100% 279 8"13151.17Phoenix, AZ4108JOC112, 137025, JOA 017Michael Brown, City of Phoenix 602.262.4597michael.brown@phoenix.gov200 W. Washington St.5th FloorPhoenix, AZ 85003Gary Rodgers David Burbank CIPP - AZ 12/13/19 $1,399,045.26 100% 37241 8", 10", 12"13151.18Phoenix, AZ4108JOC112, 37025, JOA 018Michael Brown, City of Phoenix 602.262.4597michael.brown@phoenix.gov200 W. Washington St.5th FloorPhoenix, AZ 85003Gary Rodgers David Burbank CIPP - AZ 10/2/19 $549,740.52 100% 6786 8", 10", 12"13151.19Phoenix, AZ4108JOC112, 37025, JOA 019Michael Brown, City of Phoenix 602.262.4597michael.brown@phoenix.gov200 W. Washington St.5th FloorPhoenix, AZ 85003Gary Rodgers David Burbank CIPP - AZ 2/7/20 $846,824.70 100% 6941 8", 10", 12"14035.09Johnson County, KSCMSD Contract No. 19, Term 2017‐2018, Auth 9Joseph Barnes, Johnson County WastewaterP  913.715.684811811 S. Sunset Drive, #2500Olathe, KS 66061Danny Brown Randy Mather CIPP - KS 2/3/20 $1,363,852.95 100% 55849 8", 10", 12" 15", 18", 30"14035.11Johnson County, KSCMSD Contract No. 19, , Auth 11Brandon Morris, Johnson County WastewaterP  913.207.5234Brandon.Morris@jcw.org 4800 Nall AvenueMission, KS 66202Danny Brown Brent Adams CIPP - KS 12/19/19 $1,348,775.90 100% 55872 8", 10", 12", 15"Page 2 of 39