Laserfiche WebLink
Description: <br />St. Joe River Backwater Valve Replacement (642) — Owner: City of South Bend. Installation <br />of 2 new 36" backwater valve and 1 new 42" backwater valve. $105,063.00 Completed: 2021 <br />Description: <br />LCRUD Contract C Regional B Wastewater Treatment Plant Improvements (645) — <br />Owner: LaGrange County Regional Utility District. Construction of two new buildings, <br />installation of new blowers and all associated yard piping to connect to existing equipment. <br />$1,230,212.00 Completed: 2021 <br />Description: <br />CS03 Backwater Valve Repair (652) — Owner: City of South Bend. Removal and replacement <br />of existing sanitary lift station. $109,925.00 Completed: 2021 <br />Description: <br />Dawn Estates Lift Station Replacement (662) — Owner: Town of Middlebury. Removal and <br />replacement of existing sanitary lift station. $288,491.00 Completed: 2021 <br />Description: <br />Lift Station 12 Replacement (667) — Owner: City of Elkhart. Removal and replacement of <br />existing sanitary lift station. $219,474.00 Completed: 2021 <br />Description: <br />Water System Improvements Colfax & Messner (693) — Owner: Benton Charter Township. <br />Installation of 1,600 LF of water main and restoration including concrete pavement. $486,924.00 <br />Completed: 2021 <br />Description: <br />Rock Run Sewer Improvement C (649) — Owner: City of Goshen. Installation of 2,500 LF of <br />24" & 42" sanitary sewer, concrete siphon chambers and associated restoration. $1,746,290.00 <br />Completed: 2021 <br />Description: <br />East Goshen Water Main Replacement (664) — Owner: City of Goshen. Installation of 4,000 <br />LF of water main, 50 water services and associated street repairs. $1,148,484.00 Completed: <br />2021 <br />Description: <br />JA Drive & Lexington Streetscapes (629) — Owner: City of Elkhart. Complete reconstruction <br />of the streets including new underground utilities, decorative sidewalk and new streetlights. <br />$1,987,254.00 Completed: 2020 <br />Description: <br />Wawasee Conklin Bay Trail (633) — Owner: Syracuse-Wawasee Park Foundation. Installation <br />of 1,700 LF of boardwalk and 2,500 LF of 10 concrete pathways. $2,254,710.00 Completed: <br />2020 <br />