My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2024 Curb & Sidewalk Program Proj No. 124-009 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - 2024 Curb & Sidewalk Program Proj No. 124-009 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:59:06 AM
Creation date
7/9/2024 2:46:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2024 Curb and Sidewalk Construction <br />Project Number: 124-009 <br />For Bids Due: July 911, 2024 <br />Contractor Name: Selge Construction Co., Inc. <br />DIVISION 1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />873 <br />SY <br />$ 37.75 1 <br />$ 32,955.75 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />868 <br />SY <br />$ 66.00 <br />$ 57,288.00 <br />3 <br />CONCRETE CURB, REMOVE <br />442 <br />LF <br />$ 30.75 <br />$ 13,591.50 <br />4 <br />CONCRETE CURB, MODIFIED <br />442 <br />LF <br />$ 104.25 <br />$ 46,078.50 <br />5 <br />ASPHALT APPROACH, REMOVE <br />12 <br />SY <br />$ 30.75 <br />$ 369.00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />12 <br />SY <br />$ 180.00 <br />$ 2,160.00 <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />34 <br />SY <br />$ 30.75 <br />$ 1,045.50 <br />8 <br />PERPENDICULAR CURB RAMP <br />34 <br />SY <br />$ 310.00 <br />$ 10,540.00 <br />9 <br />TOPSOIL AND SEEDING <br />959 <br />SY <br />$ 8.65 <br />$ 8,295.35 <br />10 <br />TREE, REMOVE, 10-IN <br />2 <br />EA <br />$ 525.00 <br />$ 1,050.00 <br />11 <br />STUMP, REMOVE <br />1 <br />EA <br />$ 350.00 <br />$ 350.00 <br />12 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM. 2-IN TO 2.5-IN <br />23 <br />EA <br />$ 825.00 <br />$ 18,975.00 <br />DIVISION 1 TOTAL $ 192 698.60 <br />DIVISION 2 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />736 <br />SY <br />$ 34.40 <br />$ 25,318.40 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />732 <br />SY <br />$ 63.25 <br />$ 46,299.00 <br />3 <br />CONCRETE CURB, REMOVE <br />1360 <br />LF <br />$ 24.65 <br />$ 33,524.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />1360 <br />LF <br />$ 53.75 <br />$ 73,100.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />37 <br />SY <br />$ 24.65 <br />$ 912.05 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />37 <br />SY <br />$ 132.00 <br />$ 4,884.00 <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />25 <br />SY <br />$ 24.65 <br />$ 616.25 <br />8 <br />PERPENDICULAR CURB RAMP <br />25 <br />SY <br />$ 315.00 <br />$ 7,875.00 <br />9 <br />TOPSOIL AND SEEDING <br />470 <br />SY <br />$ 9.95 <br />$ 4,676.50 <br />10 <br />TREE, REMOVE, 18-IN <br />1 <br />EA <br />$ 875.00 <br />$ 875.00 <br />11 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM. 2-IN TO 2.5-IN <br />2 EA <br />$ 1,350.00 $ 2,700.00 <br />DIVISION 2 TOTAL $ 200, 780.20 <br />[CONTINUED] <br />Version 03/15/2024 Contractor's Bid for Public Works - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.