Laserfiche WebLink
. SpV CH BFPO <br />21 r <br />\ <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />U O <br />I <br />Project Name: <br />2024 Curb and Sidewalk Construction <br />Project Number: <br />124-009 <br />For Bids Due: <br />JUly 9'", 2024 <br />Contractor Name: <br />Rieth-Riley Construction <br />DIVISION 3 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />352 <br />SY <br />$26.64 <br />$9,377.28 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />352 <br />SY <br />$80.81 <br />$28,445.12 <br />3 <br />CONCRETE CURB, REMOVE <br />637 <br />LF <br />$24.09 <br />$15,345.33 <br />4 <br />CONCRETE CURB, MODIFIED <br />637 <br />LF <br />$72.22 <br />$46,004.14 <br />5 <br />CONCRETE APPROACH, REMOVE <br />30 <br />SY <br />$24.29 <br />$728.70 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />30 <br />SY <br />$196.07 <br />$5,882.10 <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />55 <br />SY <br />$79.50 <br />$4,372.50 <br />8 <br />PERPENDICULAR CURB RAMP <br />58 <br />SY <br />$395.14 <br />$22,918.12 <br />9 <br />TOPSOIL AND SEEDING <br />412 <br />SY <br />$20.97 <br />$8,639.64 <br />10 <br />TREE, REMOVE, 10-IN <br />1 <br />EA <br />$717.17 <br />$717.17 <br />11 <br />TREE, REMOVE, 18-IN <br />1 <br />EA <br />$1,017.17 <br />$1,017.17 <br />12 <br />TREE, REMOVE, 30-IN <br />2 <br />EA <br />$1,617.17 <br />$3,234.34 <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />$462.88 <br />$462.88 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM. 2-IN TO 2.5-IN <br />14 <br />EA <br />$1,000 <br />$14,000 <br />DIVISION 3 TOTAL $161,144.49 <br />[CONTINUED] <br />Version 03/15/2024 Contractor's Bid for Public Works - 8 <br />