Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2024 Curb and Sidewalk Construction <br />Project Number: 124409 <br />For Bids Due: July 9t', 2024 <br />Contractor Name: j ggmcmm 60A)CXET,E 54CR ✓rGES <br />DIVISION 1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />873 <br />SY <br />5�2� <br />4/SW.(i=' <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />868 <br />SY <br />77j <br />tiol? "j <br />3 <br />CONCRETE CURB, REMOVE <br />442 <br />LF <br />e07gr <br />4 <br />CONCRETE CURB, MODIFIED <br />442 <br />LF <br />5 <br />ASPHALT APPROACH, REMOVE <br />12 <br />SY <br />gam? <br />98y m <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />12 <br />SY <br />i?% fee- <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />34 <br />SY <br />`��? <br />,� p` <br />8 <br />PERPENDICULAR CURB RAMP <br />34 <br />SY <br />019 <br />R50 <br />Q sGb <br />9 <br />TOPSOIL AND SEEDING <br />959 <br />SY <br />3y <br />32 &a(o � <br />10 <br />TREE, REMOVE, 10-IN <br />2 <br />EA <br />SO <br />/J 3av <br />11 <br />STUMP, REMOVE <br />1 <br />EA <br />5760 <br />12 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2dN TO 2.5-IN _�[/ <br />23 <br />EA <br />(N!O <br />=J OOo <br />0 <br />DIVISION 1 TOTAL ?O '%(qo � <br />DIVISION 2 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />736 <br />SY <br />5'3 ,O� <br />3% 04 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />732 <br />SY <br />07 3 =' <br />53, 936 <br />3 <br />CONCRETE CURB, REMOVE <br />1360 <br />LF <br />'2 7 <br />4 <br />CONCRETE CURB, MODIFIED <br />1360 <br />LF <br />13?p Q <br />5 <br />CONCRETE APPROACH, REMOVE <br />37 <br />SY <br />Fjp a,— <br />219 (00 <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />37 <br />SY <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />25 <br />SY <br />8 <br />PERPENDICULAR CURB RAMP <br />25 <br />SY <br />Z6S�' <br />(p7 i7ASAAz <br />9 <br />TOPSOIL AND SEEDING <br />470 <br />SY <br />39 <br />7 $60 <br />10 <br />TREE, REMOVE, 18-IN <br />1 <br />EA <br />q��t <br />jU0 <br />11 <br />PLANT, <br />STEM. <br />DECIDUOUS TREE, SINGLE <br />2-IN TO 2.5-IN <br />2 <br />EA <br />�s p1Gp <br />m <br />DIVISION 2 TOTAL <br />[CONTINUED] <br />Version 03/15/2024 Contractor's Bid for Public Works - 7 <br />