Laserfiche WebLink
A1.05 Post -Construction Phase <br />A. Upon written authorization from Owner during the Post -Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />defects, and make recommendations as to replacement or correction of defective Work, if <br />any. <br />2. Together with Owner or Owner's representative, visit the Project within one month before <br />the end of the correction period to ascertain whether any portion of the Work is subject to <br />correction. <br />3. Perform or provide the following additional Post -Construction Phase tasks or deliverables: <br />None <br />B. The Post -Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate three months after the commencement of the <br />Construction Contract's correction period <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is <br />modified as follows: <br />Exhibit A, Part 1 — Basic Services, A1.01 Project Scope: <br />"The City of South Bend anticipates replacing approximately 1 Q� 500 water service <br />lines identified as having lead as part of this project. The Indiana Finance Authority allows <br />for only full replacement as a part of this bid specifications. Full replacement is defined as <br />follows: <br />• Full Replacement - Replacement of the section of service line from the corporation stop <br />at the water main to the water meter inside of the dwelling or Replacement of the <br />section of service line from the corporation stop at the water main to the water meter <br />outside of the dwelling then to the first shut off within the dwelling <br />The project funding is currently $S million for the service replacements and is being <br />funded by the Indiana Finance Authority through a loan/grant and $1.3 million for water <br />main replacement with local funding. " <br />Page 7 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />