My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Fellows Booster Pump Station Improvements - Contract B Proj No. 121-070B - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Award Bids
>
Award Bid - Fellows Booster Pump Station Improvements - Contract B Proj No. 121-070B - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 9:01:30 AM
Creation date
6/11/2024 1:21:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Description: <br />Parking Lot & ADA Compliant Trail (717) — Owner: Indiana Dept. of Natural Resources. <br />Installation of approximately 1,400LF of gravel pathway. $159,850.00. Completed: 2022. <br />Description: <br />2021 Drainage Improvements - Kaley & Marion St (706) — Owner: City of South Bend. <br />Installation of new drainage structures, new concrete curb, and asphalt re -surfacing. <br />$246,810.00. Completed: 2022. <br />Description: <br />Laurel Woods Drainage Improvements (702) — Owner: City of South Bend. Excavation of <br />existing retention pond and site storm system. $125,142.00. Completed: 2022. <br />Description: <br />South Main Streetscapes Project (694) — Owner: City of Elkhart. Installation of 2700 LF of <br />24" perforated storm sewer and all appurtenances. Installation of 36" sanitary sewer. Complete <br />construction of new concrete sidewalks, driveways, and asphalt paving. $2,785,222.00. <br />Completed: 2022. <br />Description: <br />Buchanan - Yellow Lake Project (692) — Owner: Buchanan Land, LLC. Complete construction <br />of approximately 5 miles of gravel pathway through woods. $944,657.00. Completed: 2022. <br />Description: <br />Lift Station Replacement & Improvements (688) — Owner: Coloma Charter Township. <br />Installation of 6 new lift stations, including SCADA system upgrades. $1,928,234.00. <br />Completed: 2022. <br />Description: <br />Lakeside Sewer Relocation (674) — Owner: City of Laporte. Installation of 4500 LF of Low- <br />pressure sewer and 38 grinder pumps. One complete lift station replacement. $1,637,111.00. <br />Completed: 2022. <br />Description: <br />INDOT R41066A — Elkhart SR 19 Concrete Pavement (672) — Owner: Indiana Department of <br />Transportation. 12" Concrete paving patching on State Highway. $2,172,788.00. Completed: <br />2022 <br />Description: <br />Contract 3 NE Section SS Improvements (669) — Owner: City of Benton Harbor. Complete <br />Construction of new Roadways including Sanitary Sewer, Storm Sewer, Water Main, Concrete <br />Curbs and Driveways. $4,554,745.00. Completed: 2022. <br />Description: <br />Park Shore Drive & East Street Improvements (668) — Owner: Village of Cassopolis. <br />Drainage improvements and new road reconstruction. $731,154.00. Completed: 2022. <br />
The URL can be used to link to this page
Your browser does not support the video tag.