My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Demolition of South Bend Medical Foundation Proj No. 123-076 - The MRD Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Award Bids
>
Award Bid - Demolition of South Bend Medical Foundation Proj No. 123-076 - The MRD Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 8:54:32 AM
Creation date
6/11/2024 1:21:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
uTH INTER -OFFICE MEMORANDUM <br />r <br />U\ <br />DEPARTMENT OF PUBLIC WORKS <br />x �4i5 k DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, PE, Sr. Project Engineer <br />SUBJECT: Award Bid - Project No. 123-076 <br />Demolition of South Bend Medical Foundation <br />DATE: 06/10/2024 <br />On May 28, 2024, the Board of Public Works opened and read bids for the above project. The <br />project covers the demolition and backfilling of the former South Bend Medical Foundation <br />building located at 531 N. Main Street. <br />Seven bids were received, with a summary of the bids as follows: <br />Contractor <br />Bid Price <br />Met Responsible <br />Bidder Ord.? <br />Met M/W goals? <br />Dore & Assoc. <br />$1,492,700 <br />No <br />Neither goal met. <br />MRD Group <br />$1,763,000 <br />Yes <br />Both goals met. <br />Sabre Demo <br />$1,873,000 <br />No <br />MBE met, no WBE. <br />Renascent <br />$2,338,000 <br />Yes <br />Both goals met. <br />Green Demo <br />$2,398,880.80 <br />Yes <br />Both goals met. <br />Walsh Constr. <br />$2,932,000 <br />Yes <br />Both goals met. <br />Adamo <br />$3,199,000 <br />Yes <br />MBE met, no WBE. <br />The low bid from Dore & Associates did not include any Responsible Bidder paperwork. They <br />did not include the required application form, nor the supporting documentation. Dore & <br />Associates also neglected to meet either the MBE (1.4%) or WBE (4.7%) goals. The low bid <br />must be rejected as non -responsive. <br />The second low bid from The MRD Group is able to meet the requirements of the Responsible <br />Bidder Ordinance and did meet both the MBE and WBE goals. They neglected to include a <br />signed copy of Addendum 2 in their bid package but were able to provide a signed copy upon <br />request. It is the opinion of the City that this exclusion did not create any unfair advantage. The <br />second low bid from MRD Group is complete and responsive. <br />I recommend award of the Demolition of South Bend Medical Foundation (#123-076) to The <br />MRD Group, in the amount of $1,763,000.00. Funding is available through PR-00032530. <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.