2024 SB LSL Replacement - West Zone Main and Service Replacement
<br />City Project No. 123-O69A
<br />City of South Bend
<br />Bid Tabulation
<br />Base Bid - Divisinn A - I and A-i- I i- On lane... -
<br />Engineer's Estimate
<br />Selge Construction
<br />HRP Construction
<br />Item
<br />No.
<br />Description
<br />Unit
<br />Quantity
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />1
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$30,633.38
<br />$30,633.38
<br />$60,425.00
<br />$60,425.00
<br />$72,000.00
<br />$72,000.00
<br />2.
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$10,000.00
<br />$10,000.00
<br />$14,500.00
<br />$14,500.00
<br />$30,000.00
<br />$30,000.00
<br />3.
<br />Removals and Clearing
<br />1
<br />LS
<br />$30,000.00
<br />$30,000.00
<br />$91,250.00
<br />$91,250.00
<br />$287,940.00
<br />$287,940.00
<br />4.
<br />Concrete Curb, Remove
<br />1,260
<br />LFT
<br />$10.00
<br />$12,600.00
<br />$10.00
<br />$12,600.00
<br />$15.00
<br />$18,900.00
<br />5.
<br />Concrete Sidewalk, Remove
<br />485
<br />SYD
<br />$20.00
<br />$9,700.00
<br />$10.00
<br />$4,850.00
<br />$23.00
<br />$11,155.00
<br />6.
<br />Existing Water Service, Potholing
<br />56
<br />E4
<br />$750.00
<br />$42,000.00
<br />$1,025.00
<br />$57,400.00
<br />$2,000.00
<br />$112,000.00
<br />7.
<br />Temporary Erosion and Sediment Control
<br />1
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />$1,700.00
<br />$1,700.00
<br />$10,000.00
<br />$10,000.00
<br />8.
<br />Compacted Aggregate, No. 53, 6"
<br />825
<br />SYD
<br />$14.50
<br />$11,962.50
<br />$30.25
<br />$24,956.25
<br />$28.00
<br />$23,100.00
<br />9.
<br />HMA for Patching, 8"
<br />825
<br />SYD
<br />$40.00
<br />$33,000.00
<br />$110.00
<br />$90,750.00
<br />$175.00
<br />$144,375.00
<br />10.
<br />Standard Curb
<br />1,260
<br />LFT
<br />$40.00
<br />$50,400.00
<br />$63.75
<br />$80,325.00
<br />$45.50
<br />$57,330.00
<br />11.
<br />Concrete Sidewalk, 4"
<br />463
<br />SYD
<br />$70.00
<br />$32,410.00
<br />$80.00
<br />$37,040.00
<br />$68.00
<br />$31,484.00
<br />12.
<br />Concrete Curb Ramp
<br />22
<br />SYD
<br />$130.00
<br />$2,860.00
<br />$253.50
<br />$5,577.00
<br />$208.00
<br />$4,576.00
<br />13.
<br />Detectable Warning Surface
<br />5
<br />SYD
<br />$100.00
<br />$500.00
<br />$330.00
<br />$1,650.00
<br />$413.00
<br />$2,065.00
<br />14.
<br />Water Service, 1", Long Side
<br />28
<br />EA
<br />$7,500.00
<br />$210,000.00
<br />$9,185.00
<br />$257,180.00
<br />$8,000.00
<br />$224,000.00
<br />15.
<br />Water Service, 1", Short Side
<br />28
<br />EA
<br />$6,000.00
<br />$168,000.00
<br />$8,685.00
<br />$243,180.00
<br />$7,150.00
<br />$200,200.00
<br />16.
<br />Mulched Seeding, Type U
<br />2,150
<br />SYD
<br />$5.00
<br />$10,750.00
<br />$5.79
<br />$12,448.50
<br />$10.00
<br />$21,500.00
<br />17.
<br />Street Tree
<br />6
<br />EA
<br />$700.00
<br />$4,200.00
<br />$1,025.00
<br />$6,150.00
<br />$589.00
<br />$3,534.00
<br />Total - Base Bid, Division A
<br />$664,015.88
<br />$1,001,981.75
<br />$1,254,159.00
<br />Base Bid - Division B - Water Main Ranhra. ..d
<br />Engineer's Estimate
<br />Selge Construction
<br />HRP Construction
<br />Item
<br />No.
<br />Description
<br />Unit
<br />Quantity
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />18.
<br />Concrete Curb, Remove
<br />40
<br />LFT
<br />$10.00
<br />$400.00
<br />$10.00
<br />$400.00
<br />$15.00
<br />$600.00
<br />19.
<br />Pavement, Remove
<br />147
<br />SYD
<br />$75.00
<br />$11,025.00
<br />$25.00
<br />$3,675.00
<br />$100.00
<br />$14,700.00
<br />20.
<br />B-Borrow (Undistributed)
<br />100
<br />CYDK$40.00
<br />$3,000.00
<br />$17.25
<br />$1,725.00
<br />$20.00
<br />$2,000.00
<br />21.
<br />Flowable Fill (Undistributed)
<br />100
<br />CYO
<br />$4,500.00
<br />$130.00
<br />$13,000.00
<br />$125.00
<br />$12,500.00
<br />22.
<br />Compacted Aggregate, No. 53, 6"
<br />182
<br />SYD
<br />$2,639.00
<br />$30.25
<br />$5,505.50
<br />$28.00
<br />$5,096.00
<br />23.
<br />HMA for Patching, 8"
<br />55
<br />SYD
<br />$2,117.50
<br />$160.00
<br />$8,800.00
<br />$175.00
<br />$9,625.00
<br />24.
<br />PCCP for Patching, 8"
<br />95
<br />SYD
<br />$11,875.00
<br />$150.00
<br />$14,250.00
<br />$168.00
<br />$15,960.00
<br />25.
<br />PCCP for Approaches, 6"
<br />32
<br />SYD
<br />$3,200.00
<br />$186.75
<br />$5,976.00
<br />$162.00
<br />$5, 184.00
<br />26.
<br />Standard Curb
<br />40
<br />LFT
<br />$1,600.00
<br />$63.75
<br />$2,550.00
<br />$45.50
<br />$1,820.00
<br />27.
<br />Water Main, 8"
<br />1,338
<br />LFT
<br />$100,350.00
<br />$119.00
<br />$159,222.00r$3,500.00
<br />00
<br />$96,336.00
<br />28.
<br />Gate Valve, 8"
<br />2
<br />EA
<br />$3,000.00
<br />$6,000.00
<br />$2,750.00
<br />$5,500.00
<br />$7,000.00
<br />29.
<br />Tapping Sleeve and Valve, 16" x 8"
<br />1
<br />EA
<br />$15,000.00
<br />$15,000.00
<br />$9,700.00
<br />$9,700.00
<br />0.00
<br />$10,000.00
<br />30.
<br />Tapping Sleeve and Valve, 8" x 8"
<br />1
<br />EA
<br />$8,000.00
<br />$8,000.00
<br />$6,350.00
<br />$6,350.00
<br />.00
<br />$8,500.00
<br />31.
<br />Fire Hydrant, Assembly
<br />1
<br />EA
<br />$6,500.00
<br />$6,500.00
<br />$9,125.00
<br />$9,125.00
<br />.00
<br />$9,500.00
<br />32.
<br />Connect to Existing Fire Hydrant
<br />1
<br />EA
<br />$3,500.00
<br />$3,500.00
<br />$5.300.00
<br />$5,300.00
<br />$4,500.00
<br />$4,500.00
<br />33.
<br />Water Main, Abandon in Place
<br />1,252
<br />LFT
<br />$20.00
<br />$25,040.00
<br />$13.00
<br />$16,276.00
<br />$10.00
<br />$12,520.00
<br />Total - Base Bid, Division B
<br />$204,746.50
<br />$267,354.50
<br />$215,841.00
<br />Base Bid Total (Division A + B)
<br />$868,762.38
<br />$1,269,336.25
<br />$1,470,000.00
<br />1 of 2