Laserfiche WebLink
2024 SB LSL Replacement - West Zone Main and Service Replacement <br />City Project No. 123-O69A <br />City of South Bend <br />Bid Tabulation <br />Base Bid - Divisinn A - I and A-i- I i- On lane... - <br />Engineer's Estimate <br />Selge Construction <br />HRP Construction <br />Item <br />No. <br />Description <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />1 <br />Mobilization/Demobilization <br />1 <br />LS <br />$30,633.38 <br />$30,633.38 <br />$60,425.00 <br />$60,425.00 <br />$72,000.00 <br />$72,000.00 <br />2. <br />Maintenance of Traffic <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />$14,500.00 <br />$14,500.00 <br />$30,000.00 <br />$30,000.00 <br />3. <br />Removals and Clearing <br />1 <br />LS <br />$30,000.00 <br />$30,000.00 <br />$91,250.00 <br />$91,250.00 <br />$287,940.00 <br />$287,940.00 <br />4. <br />Concrete Curb, Remove <br />1,260 <br />LFT <br />$10.00 <br />$12,600.00 <br />$10.00 <br />$12,600.00 <br />$15.00 <br />$18,900.00 <br />5. <br />Concrete Sidewalk, Remove <br />485 <br />SYD <br />$20.00 <br />$9,700.00 <br />$10.00 <br />$4,850.00 <br />$23.00 <br />$11,155.00 <br />6. <br />Existing Water Service, Potholing <br />56 <br />E4 <br />$750.00 <br />$42,000.00 <br />$1,025.00 <br />$57,400.00 <br />$2,000.00 <br />$112,000.00 <br />7. <br />Temporary Erosion and Sediment Control <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />$1,700.00 <br />$1,700.00 <br />$10,000.00 <br />$10,000.00 <br />8. <br />Compacted Aggregate, No. 53, 6" <br />825 <br />SYD <br />$14.50 <br />$11,962.50 <br />$30.25 <br />$24,956.25 <br />$28.00 <br />$23,100.00 <br />9. <br />HMA for Patching, 8" <br />825 <br />SYD <br />$40.00 <br />$33,000.00 <br />$110.00 <br />$90,750.00 <br />$175.00 <br />$144,375.00 <br />10. <br />Standard Curb <br />1,260 <br />LFT <br />$40.00 <br />$50,400.00 <br />$63.75 <br />$80,325.00 <br />$45.50 <br />$57,330.00 <br />11. <br />Concrete Sidewalk, 4" <br />463 <br />SYD <br />$70.00 <br />$32,410.00 <br />$80.00 <br />$37,040.00 <br />$68.00 <br />$31,484.00 <br />12. <br />Concrete Curb Ramp <br />22 <br />SYD <br />$130.00 <br />$2,860.00 <br />$253.50 <br />$5,577.00 <br />$208.00 <br />$4,576.00 <br />13. <br />Detectable Warning Surface <br />5 <br />SYD <br />$100.00 <br />$500.00 <br />$330.00 <br />$1,650.00 <br />$413.00 <br />$2,065.00 <br />14. <br />Water Service, 1", Long Side <br />28 <br />EA <br />$7,500.00 <br />$210,000.00 <br />$9,185.00 <br />$257,180.00 <br />$8,000.00 <br />$224,000.00 <br />15. <br />Water Service, 1", Short Side <br />28 <br />EA <br />$6,000.00 <br />$168,000.00 <br />$8,685.00 <br />$243,180.00 <br />$7,150.00 <br />$200,200.00 <br />16. <br />Mulched Seeding, Type U <br />2,150 <br />SYD <br />$5.00 <br />$10,750.00 <br />$5.79 <br />$12,448.50 <br />$10.00 <br />$21,500.00 <br />17. <br />Street Tree <br />6 <br />EA <br />$700.00 <br />$4,200.00 <br />$1,025.00 <br />$6,150.00 <br />$589.00 <br />$3,534.00 <br />Total - Base Bid, Division A <br />$664,015.88 <br />$1,001,981.75 <br />$1,254,159.00 <br />Base Bid - Division B - Water Main Ranhra. ..d <br />Engineer's Estimate <br />Selge Construction <br />HRP Construction <br />Item <br />No. <br />Description <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />18. <br />Concrete Curb, Remove <br />40 <br />LFT <br />$10.00 <br />$400.00 <br />$10.00 <br />$400.00 <br />$15.00 <br />$600.00 <br />19. <br />Pavement, Remove <br />147 <br />SYD <br />$75.00 <br />$11,025.00 <br />$25.00 <br />$3,675.00 <br />$100.00 <br />$14,700.00 <br />20. <br />B-Borrow (Undistributed) <br />100 <br />CYDK$40.00 <br />$3,000.00 <br />$17.25 <br />$1,725.00 <br />$20.00 <br />$2,000.00 <br />21. <br />Flowable Fill (Undistributed) <br />100 <br />CYO <br />$4,500.00 <br />$130.00 <br />$13,000.00 <br />$125.00 <br />$12,500.00 <br />22. <br />Compacted Aggregate, No. 53, 6" <br />182 <br />SYD <br />$2,639.00 <br />$30.25 <br />$5,505.50 <br />$28.00 <br />$5,096.00 <br />23. <br />HMA for Patching, 8" <br />55 <br />SYD <br />$2,117.50 <br />$160.00 <br />$8,800.00 <br />$175.00 <br />$9,625.00 <br />24. <br />PCCP for Patching, 8" <br />95 <br />SYD <br />$11,875.00 <br />$150.00 <br />$14,250.00 <br />$168.00 <br />$15,960.00 <br />25. <br />PCCP for Approaches, 6" <br />32 <br />SYD <br />$3,200.00 <br />$186.75 <br />$5,976.00 <br />$162.00 <br />$5, 184.00 <br />26. <br />Standard Curb <br />40 <br />LFT <br />$1,600.00 <br />$63.75 <br />$2,550.00 <br />$45.50 <br />$1,820.00 <br />27. <br />Water Main, 8" <br />1,338 <br />LFT <br />$100,350.00 <br />$119.00 <br />$159,222.00r$3,500.00 <br />00 <br />$96,336.00 <br />28. <br />Gate Valve, 8" <br />2 <br />EA <br />$3,000.00 <br />$6,000.00 <br />$2,750.00 <br />$5,500.00 <br />$7,000.00 <br />29. <br />Tapping Sleeve and Valve, 16" x 8" <br />1 <br />EA <br />$15,000.00 <br />$15,000.00 <br />$9,700.00 <br />$9,700.00 <br />0.00 <br />$10,000.00 <br />30. <br />Tapping Sleeve and Valve, 8" x 8" <br />1 <br />EA <br />$8,000.00 <br />$8,000.00 <br />$6,350.00 <br />$6,350.00 <br />.00 <br />$8,500.00 <br />31. <br />Fire Hydrant, Assembly <br />1 <br />EA <br />$6,500.00 <br />$6,500.00 <br />$9,125.00 <br />$9,125.00 <br />.00 <br />$9,500.00 <br />32. <br />Connect to Existing Fire Hydrant <br />1 <br />EA <br />$3,500.00 <br />$3,500.00 <br />$5.300.00 <br />$5,300.00 <br />$4,500.00 <br />$4,500.00 <br />33. <br />Water Main, Abandon in Place <br />1,252 <br />LFT <br />$20.00 <br />$25,040.00 <br />$13.00 <br />$16,276.00 <br />$10.00 <br />$12,520.00 <br />Total - Base Bid, Division B <br />$204,746.50 <br />$267,354.50 <br />$215,841.00 <br />Base Bid Total (Division A + B) <br />$868,762.38 <br />$1,269,336.25 <br />$1,470,000.00 <br />1 of 2 <br />