Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: RACLIN MURPHY ENCORE CENTER <br />Project Number: 123-056 <br />For Bids Due: June 11, 2024 at 9:00 AM Local Time <br />Contractor Name: <br /> <br />Version 03/15/2024 Contractor’s Bid for Public Works - 7 <br /> <br /> BASE BID <br />Item <br />No. Description Quantity Unit Unit Price Total Amount <br />1 Base Bid 1 LSUM <br /> BASE BID TOTAL <br /> <br />ALTERNATE #1 (DEDUCT) <br />Item <br />No. Description Quantity Unit Unit Price Total Amount <br />1 <br />Exclude the buildout of the VIP Lounge <br />and the balcony and including these <br />areas as part of the open public space. <br />1 DEDUCT <br /> <br /> ALTERNATE #1 TOTAL <br /> <br />ALLOWANCES <br />Item <br />No. Description Quantity Unit Unit Price Total Amount <br />1 Special Inspections 1 ALW $40,000 $40,000 <br />2 Winter Conditions 1 ALW $55,000 $55,000 <br />3 Dewatering (assumes surface water <br />removal via sumping) 1 ALW $4,500 $4,500 <br />4 Underground obstruction removal 1 ALW $10,000 $10,000 <br />5 Misc. Underground utility relocations 1 ALW $15,000 $15,000 <br />6 VIP Bar equipment (base bid only) 1 ALW $50,000 $50,000 <br />7 2nd Floor light feature 1 ALW $300,000 $300,000 <br />8 Unsuitable Soils 1 UC $X per cu. Yd. <br /> ALLOWANCES TOTAL <br /> <br />Bidder (Firm): <br />Address: <br />City/State/Zip: Telephone Number: ( ) <br />By <br /> <br />(Signature) <br /> (Printed Name of Person Signing) <br />Larson-Danielson Construction Company, Inc. <br />Larson-Danielson Construction Company, Inc. <br />302 Tyler Street <br />LaPorte, IN 219 362-2127 <br />46350 <br />X <br />Brian T. Larson, President <br />LARSON-DANIELSON <br />CONSTRUCTION CO., INC. <br />S T A TE OF <br />INDIA AN <br />SEAL <br />C or porate <br />$47.00 per cubic <br /> yard$474,500 <br />(Does not include #8-CY tbd) <br />DEDUCT <br />$275,000 $275,000 <br /> $275,000 <br />$15,202,000 $15,202,000 <br />$15,202,000