My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - CSO 22 Control Valve Replacement Proj No. 123-032 - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - CSO 22 Control Valve Replacement Proj No. 123-032 - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:00:17 PM
Creation date
6/11/2024 1:15:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 <br />Golden Harvest, Inc. <br />14 Golden Gates Tm <br />NAMED <br />QUOTATION #24-0606 Rev-1 MANUFACTURER <br />Field Senflce: Meld S nylce Includes! <br />Total Number of Trips: 1 Installation inspection, testing, start-up, and training. <br />Total Number of Days: 2 Includes electric actuator start-up. <br />Web: www.goldenharvesrinc.com <br />Page 2 of 2 <br />field Service Notes: <br />REQUEST IN WRITING SHOULD BE MADE 21 DAYS BEFORE SERVICE IS REQUIRED. ADDITIONAL CHARGES FOR SHORTER TIMEFRAM ES. <br />If additional days are required, they are available at $1,050 per day, plus actual travel and maintenance expenses. <br />Service stated is GHI's interpretation of requirements in specification. Contact GHI for additional trips/days. <br />Service Total: <br />NOTES: <br />1 <br />Trips <br />2 <br />Days <br />1. Stainless steel anchor bolts are included for concrete mounted frames. 3. SALES TAX NOT INCLUDED IN PRICE. <br />2. Eooxy adhesive by contractor. 1 4. Mill finish on stainless steel/atuminum surfaces. <br />
The URL can be used to link to this page
Your browser does not support the video tag.