Laserfiche WebLink
Page 2 <br />*BUC Terms & Conditions: <br />Structure have gaskets joints,12" joint wrap, and booted pipe connections. <br />Structure 201 included flow channel. <br />Larger flow channel and drop connections to be constructed in field. <br />Antimicrobial or crystalline admixtures NOT included. <br />Structures are uncoated. <br />Customer to unload at jobsite. <br />WBE Spend Goal (60% Supplier-WBE Cert letter attached): $116,702.95 <br />1.Materials purchased after expired quote date of 7/10/2024 are subject to <br />price increases. Due to the volatility in the PVC industry, PVC pipe and fittings <br />are priced at time of order. Full truckload freight included with purchase of <br />entire quote. Materials ship by 10/1/24. Quote is based on BUC's <br />interpretation of plans/specs-contractor to determine final materials and/or <br />quantities. <br />2. If materials are used for WBE goal, contact BUC ASAP. Additional materials <br />purchased after 7/10/24 are at market price. Please note, any materials <br />purchased in 2025 will be at market price. All materials are non-refundable. All <br />materials are Domestic, BABA Compliant. <br />3. BUC shall not be held liable or responsible to the other party nor be <br />deemed to have defaulted under or breached this quote for failure or delay in <br />fulfilling or performing any term of this quote to the extent and for so long as, <br />such failure or delays caused by or results from causes beyond the reasonable <br />control of BUC, including supply chain delays, pandemics, quarantines & <br />weather. <br />