Page 13
<br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services
<br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
<br />seq.; and (g) any other federal, state, or local statute, law, rule, regulation, ordinance,
<br />resolution, code, order, or decree regulating, relating to, or imposing liability or standards
<br />of conduct concerning, any hazardous, toxic, or dangerous waste, substance, or material.
<br />8.Consultants – Individuals or entities having a contract with Engineer to furnish services
<br />with respect to this Project as Engineer’s independent professional associates and
<br />consultants; subcontractors; or vendors.
<br />9.Contract Documents – Those items so designated in the Construction Contract, including
<br />the Drawings, Specifications, construction agreement, and general and supplementary
<br />conditions. Only printed or hard copies of the items listed in the Construction Contract
<br />are Contract Documents. Approved Shop Drawings, other Contractor submittals, and the
<br />reports and drawings of subsurface and physical conditions are not Contract Documents.
<br />10.Contractor – The entity or individual with which Owner has entered into a Construction
<br />Contract.
<br />11.Documents – Data, reports, Drawings, Specifications, Record Drawings, and other
<br />deliverables, whether in printed or electronic media format, provided or furnished in
<br />appropriate phases by Engineer to Owner pursuant to this Agreement.
<br />12.Drawings – That part of the Contract Documents prepared or approved by Engineer
<br />which graphically shows the scope, extent, and character of the Work to be performed by
<br />Contractor. Shop Drawings are not Drawings as so defined.
<br />13.Effective Date – The date indicated in this Agreement on which it becomes effective, but
<br />if no such date is indicated, the date on which this Agreement is signed and delivered by
<br />the last of the parties to sign and deliver.
<br />14.Engineer – The individual or entity named as such in this Agreement.
<br />15.Hazardous Waste – The term Hazardous Waste shall have the meaning provided in
<br />Section 1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from
<br />time to time.
<br />16.Laws and Regulations; Laws or Regulations – Any and all applicable laws, rules,
<br />regulations, ordinances, codes, and orders of any and all governmental bodies, agencies,
<br />authorities, and courts having jurisdiction.
<br />17.Owner – The individual or entity with which Engineer has entered into this Agreement
<br />and for which the Engineer's services are to be performed. Unless indicated otherwise,
<br />this is the same individual or entity that will enter into any Construction Contracts
<br />concerning the Project.
<br />18.PCBs – Polychlorinated biphenyls.
<br />19.Petroleum – Petroleum, including crude oil or any fraction thereof which is liquid at
<br />standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds
<br />per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline,
<br />kerosene, and oil mixed with other non-hazardous waste and crude oils.
|