My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services for Leighton Building Reno Proj No. 124-001 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services for Leighton Building Reno Proj No. 124-001 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:19:11 PM
Creation date
5/28/2024 3:18:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />A1.02 Structural Engineering <br />A. Review available documents pertaining to the buildings which may include, but may not be <br />limited to, original construction documents and drawings, previous assessment reports, and <br />documents related to any repair/rehabilitation projects. <br />B. Two (2) site visits, one (1) in December before the pool is drained to assess leakage sources, <br />and one (1) in early January after the pool has been drained to assess the extent of damage. <br />Mileage and Travel time included. <br />1. Visual assessment of structure below and around the pool. <br />2. Engineer will capture photographs, make observations, and take measurements. <br />3. Deck Drains will be examined with a borescope/plumbing camera on both occasions <br />(as needed) to evaluate the inside of the drainage system and ascertain leak sources. <br />4. Hammer sounding/rodding/chain dragging pool slab and deck to evaluate the <br />presence and extent of delaminated concrete. <br />C. Prepare a written report of findings based on the observations made during our site visit and <br />any other information provided. The report will include: <br />1. Summary of pertinent information and opinion regarding any structural distress <br />observed and the probable source(s) of leaks in the pool structure. <br />2. Photographs depicting representative deficiencies identified during our assessment. <br />3. Recommendations for repair with approximate areas and quantities. <br />4. Recommendations for any necessary additional testing will also be made. <br />5. MEP and Pool equipment consultant reports will be included as exhibits and <br />referenced briefly in the report. <br />A1.03 Mechanical, Plumbing and Electrical <br />Engineer will engage Advanced Engineering Consultants (AEC) as the MEP design engineer <br />based upon the attached proposal (Attachment 1). <br />A1.04 Pool Assessment <br />Engineer will engage Standard Aquatics and Recreation, LLC based upon the attached proposal <br />(Attachment 2). <br />A1.05 3D Scanning and Modelling <br />Engineer will engage PrecisionPoint Inc. to 3D scan the western half of the first floor, the entire <br />second floor, the western half of the third floor, the eastern half of the fifth floor and the impacted <br />DocuSign Envelope ID: B1372430-4CA2-4466-89D5-B1E8E2AE03E9
The URL can be used to link to this page
Your browser does not support the video tag.