Laserfiche WebLink
Amendment to Owner-Engineer Agreement <br />Page 2 <br />(Exhibit A-1 – Engineer’s Services) <br />EJCDC® E-570, Agreement Between Engineer and Owner for Professional Services. Copyright © 2014 National Society of Professional Engineers, American <br />Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. <br />2021.01526 <br /> <br />This is EXHIBIT A-1, consisting of 18 pages, replacing in its <br />entirety Exhibit A set forth in the Agreement. <br />Engineer’s Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br /> <br />Engineer shall provide Basic and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br />A1.01. Preliminary Design Phase for Owner’s Project Number 121-075 <br /> <br />A. Upon written authorization from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and opinion of probable Construction Cost of the Project. <br />2. Provide necessary field measurements and utility mapping for design purposes. Utility mapping <br />will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various cost <br />categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />a. Conduct a meeting with the Owner to review the Preliminary Design Phase documents. <br />b. Coordinate and supply necessary plans and design information for coordination of utility <br />relocations in accordance with 105 IAC 13. <br />c. Pavement replacement will be per the City of South Bend typical pavement section. Curb <br />replacement will match the existing. <br />6. Furnish a PDF for review of the Preliminary Design Phase documents and any other deliverables <br />to Owner within 21 calendar days of authorization to proceed with this phase, and review them <br />with Owner. Within 3 calendar days of receipt, Owner shall submit to Engineer any comments <br />regarding the Preliminary Design Phase documents and any other deliverables. <br />7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner’s comments, as appropriate, and furnish to Owner a pdf of the revised Preliminary <br />Design Phase documents, revised opinion of probable Construction Cost, and any other <br />deliverables within 3 calendar days after receipt of Owner’s comments. <br />B. Engineer’s services under the Preliminary Design Phase will be considered complete on the date when <br />the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables have been delivered to Owner.