My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - Design Services Leeper Ave. Proj No. 124-008 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - Design Services Leeper Ave. Proj No. 124-008 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:18:32 PM
Creation date
5/28/2024 3:18:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Amendment to Owner-Engineer Agreement <br />Page 14 <br />(Exhibit A-1 – Engineer’s Services) <br />EJCDC® E-570, Agreement Between Engineer and Owner for Professional Services. Copyright © 2014 National Society of Professional Engineers, American <br />Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. <br />2021.01526 <br /> <br />19. Final Notice of Acceptability of the Work: Conduct a final visit to the Project to determine if <br />the completed Work of Contractor is acceptable so that Engineer may recommend, in writing, <br />final payment to Contractor. Accompanying the recommendation for final payment, Engineer <br />shall also provide a notice in the form attached hereto as Exhibit E (the “Notice of Acceptability <br />of Work”) that the Work is acceptable (subject to the provisions of Paragraph A1.04.A.15.b) to <br />the best of Engineer’s knowledge, information, and belief and based on the extent of the services <br />provided by Engineer under this Agreement. <br />B. Duration of Construction Phase: The Construction Phase will commence with the execution of the <br />first Construction Contract for the Project or any part thereof and will terminate upon written <br />recommendation by Engineer for final payment to Contractors. If the Project involves more than one <br />prime contract as indicated in Paragraph A1.03.C, then Construction Phase services may be rendered <br />at different times in respect to the separate contracts. Subject to the provisions of Article 3, Engineer <br />shall be entitled to an equitable increase in compensation if Construction Phase services (including <br />Resident Project Representative services, if any) are required after the original date for completion and <br />readiness for final payment of Contractor as set forth in the Construction Contract. <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any of <br />the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible for <br />the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />A1.09. Post-Construction Phase for Owner’s Project Number 121-075 <br /> <br />A. Upon written authorization from Owner during the Post-Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />defects, and make recommendations as to replacement or correction of defective Work, if any. <br />2. Together with Owner or Owner’s representative, visit the Project within one month before the <br />end of the correction period to ascertain whether any portion of the Work is subject to correction. <br />3. Perform or provide the following additional Post-Construction Phase tasks or deliverables: <br />None. <br />B. The Post-Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract’s correction period. <br />A1.10 Post Construction Phase for Owner’s Project Number 124-008 <br /> <br />A. Upon written authorization from Owner during the Post-Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />defects, and make recommendations as to replacement or correction of defective Work, if any.
The URL can be used to link to this page
Your browser does not support the video tag.