Laserfiche WebLink
Task Name � Star# � Finish � Rrede€ <br />Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1 <br />J A S Q N D J F M A M J J A S Q N D J <br />• City of South Bend Preliminary <br />Mon Tue 1127126 <br />Construction Schedule <br />7/22/24 <br />• Administration <br />Mon 7/22/22 Fri 11/29/24 <br />Project Award <br />rAon 7/22/24 Mon 7122/24 <br />Internally Turn -Over <br />Tue7/23/24 Frig/2124 <br />3 <br />Procurment <br />Mon 8/5/24 Fri 8/16/24 <br />4 <br />Customer Kick -Off Meeting <br />Mon 8/19124 Fri 8130124 <br />4,3,5 <br />Permitting and Interconnection <br />Mon 9/30/24 Fri 11129124 <br />11 <br />A Engineering <br />Mon ;8/19/2z Fri 10/4/24 <br />Geotechnical <br />Mon 8/19124 Fri 10/4124 <br />5 <br />Surveying <br />Mon 8/19/24 Fri 1014/24 <br />5 <br />Electrical Engineering <br />Mon 8/19124 Fri 9/27124 <br />5 <br />• Construction <br />Fri 11/29/24 Fri 3/14/25 <br />Conctractor Mobilization <br />Fri 11/29/24 Fri 11/29/24 <br />7 <br />Ground Mount Stacking <br />Mon 12/2312 Tue 1212412, <br />955+90 days, <br />Pile Installation <br />Wed 12,/251t Tue 1114/25 <br />14 <br />RakcingAnd Module Inntallation <br />Wed 1/15/2`- Fri 2/7/25 <br />13,14,15 <br />AC Underground Installation <br />Mon 12/2124 Fri 2/7/25 <br />13 <br />DC Electrical Installation <br />Mon 2110/25 Fri 2/28/25 <br />17 <br />Interconenction <br />Mon 2/10/25 Fri 2/14/25 <br />17 <br />Solar Commissioning <br />Mon 2117/25 Fri 212112,5 <br />19 <br />PTO <br />Mon 2/17/25 Fri 3/7/25 <br />19 <br />Owners Training <br />Mon 3/10/25 Fri 3/14/25 <br />21 <br />• Service Fri 3/7/25 Tue V27126 <br />(1st) BI-Annual Mon 8/11/Z Mon 8/11/2s 20FS+6 m <br />(2nd) BI-Annual Tue 1/27/26 Tue 1127126 25FS+6 m <br />M&V Report. Fri 3/7/25 Fri 3/7/25 <br />