Laserfiche WebLink
AMERESCOd5 <br />Green . Clean . Sustainable <br />Summary of Guaranteed and Verified Energy and Cost Savings <br />The savings for this project were demonstrated by following a Measurement and Verification Protocol that was <br />developed by City Staff and Ameresco Engineers. Further details are included in the description of each ECM in the <br />main body of this report. The tables below show the proposed, guaranteed and verified savings for the project. These <br />values are defined as; <br />Proposed Savings The amount of savings that was determine by the engineering calculations during the technical <br />energy audit. <br />Guaranteed Savings The portion of the Proposed Savings that were guaranteed in the EPC. To provide a margin for <br />error, the Proposed Savings were reduced by a factor of safety to arrive at the Guaranteed <br />Savings. <br />Verified Savings The actual performance period savings, as determined by the methods described in the EPC <br />M&V Plan, Schedule D of the EPC. <br />Year 2 Proposed Annual Savings Overview <br />ther Energy <br />Electri a ric Total Energy <br />Total Energy Natural Gas Water Other Energy Related Total Cost <br />Ener Demand &Water Cost <br />ECM Savings Saving Savings Savings Savings Savings Savings, Year O&M Cost Savings, Year <br />(MMBtu/yr) (k/ (kW/yr) (Therm/yr) (kGal/yr) (MMBtu/yr) 2 ($/) Savings, Year 2 ($/yr) <br />2 ($/yrisb <br />City of Arvada <br />Project 3,777 11 : . 9 $253,752 <br />ProposedSavings MEN <br />Year 2 <br />Notes: <br />TMMBtu = 106 <br />1 <br />City of Arvada, Colorado I Project #37213 1 M&V Report — Year 2 1 Page 8 <br />