Laserfiche WebLink
EPC Schedule D, Rev 7-2017 Page 14 of 17 <br />M&V Approach for ECM 12 – Solar PV <br />M&V Plan Description: <br />Option A (key parameter measurement) will be <br />used to quantify the energy savings associated <br />with this ECM. <br />Baseline Performance <br />Parameters: <br />x Key parameters for the Solar PV savings include <br />plane of array insolation hitting PV system and PV <br />energy production. <br /> <br />Post Installation <br />Performance Parameters: <br />x Confirm expected PV system efficiency (insolation <br />vs. kW output). <br />Performance Assurance <br />Activities (Construction <br />Period): <br />x Confirm ECM was installed as stated in the scope <br />of work and is performing as specified prior to <br />acceptance. <br />x Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />Performance Assurance <br />Activities (Year 1): <br />x No ongoing measurements involved with this <br />ECM. <br />x Quarterly site visits to all Customer facilities <br />impacted by EPC project. <br />x Record energy generated during the first <br />Guarantee Year (using included PV monitoring <br />systems) <br />x Include findings in annual M&V Report. <br />Performance Assurance <br />Activities (Year 2-3): <br />x Record energy generated during the Guarantee <br />Years 2 and 3 (using included PV monitoring <br />systems). <br />x Include findings in annual M&V Report. <br /> <br /> <br />DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907