Laserfiche WebLink
DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907 <br />M&V Approach for ECM 12 - Solar PV <br />Option A (key parameter measurement) will be <br />M&V Plan Description: <br />used to quantify the energy savings associated <br />with this ECM. <br />• Key parameters for the Solar PV savings include <br />Baseline Performance <br />plane of array insolation hitting PV system and PV <br />Parameters: <br />energy production. <br />Post Installation <br />• Confirm expected PV system efficiency (insolation <br />Performance Parameters: <br />vs. kW output). <br />• Confirm ECM was installed as stated in the scope <br />Performance Assurance <br />of work and is performing as specified prior to <br />Activities (Construction <br />acceptance. <br />Period): <br />. Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />• No ongoing measurements involved with this <br />ECM. <br />• Quarterly site visits to all Customer facilities <br />Performance Assurance <br />impacted by EPC project. <br />Activities (Year 1): <br />• Record energy generated during the first <br />Guarantee Year (using included PV monitoring <br />systems) <br />• Include findings in annual M&V Report. <br />• Record energy generated during the Guarantee <br />Performance Assurance <br />Years 2 and 3 (using included PV monitoring <br />Activities (Year 2-3): <br />systems). <br />• Include findings in annual M&V Report. <br />EPC Schedule D, Rev 7-2017 Page 14 of 17 <br />