Laserfiche WebLink
DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907 <br />M&V Plan <br />The table below lists the M&V approach for each energy conservation measure. <br />M&V Option Summary by ECM <br />MethodECM M&V <br />ECM 1— Bldg. Env. Infiltration <br />Option S <br />Upgrades <br />ECM 2 — Bldg. Envelope Added <br />Option S <br />Insulation <br />ECM 4 — Cooling Upgrades <br />Option A* <br />ECM 5 — RTU Upgrades <br />Option S <br />ECM 6 — Boiler Upgrades <br />Option A <br />ECM 8 — Int. and Ext. Lighting <br />Option A <br />Upgrades <br />ECM 9 — Street Lighting upgrades <br />Option A <br />ECM 10 —Electric Tariff <br />Option S <br />Optimization <br />ECM 11—Gas Procurement <br />Option S <br />Optimization <br />ECM 12 — Solar PV <br />Option A <br />ECM 13 — Plumbing Efficiency <br />Option A <br />ECM 14 — Multizone conversion to <br />Option S <br />VAV <br />ECM 15 — Update Delta Software <br />n/a** <br />ECM 16 — BAS Event Schedule <br />Option S <br />Integration <br />ECM 20—Analytics Planner <br />n/a** <br />* Verify new chiller plant sequencing over the course of 15t year of M&V <br />** No guaranteed savings associated with this ECM <br />EPC Schedule D, Rev 7-2017 Page 2 of 17 <br />