Laserfiche WebLink
EPC Schedule D, Rev 7-2017 Page 2 of 17 <br />M&V Plan <br />The table below lists the M&V approach for each energy conservation measure. <br />M&V Option Summary by ECM <br />ECM M&V Method <br />ECM 1 – Bldg. Env. Infiltration <br />Upgrades Option S <br />ECM 2 – Bldg. Envelope Added <br />Insulation Option S <br />ECM 4 – Cooling Upgrades Option A* <br />ECM 5 – RTU Upgrades Option S <br />ECM 6 – Boiler Upgrades Option A <br />ECM 8 – Int. and Ext. Lighting <br />Upgrades Option A <br />ECM 9 – Street Lighting upgrades Option A <br />ECM 10 – Electric Tariff <br />Optimization Option S <br />ECM 11 – Gas Procurement <br />Optimization Option S <br />ECM 12 – Solar PV Option A <br />ECM 13 – Plumbing Efficiency Option A <br />ECM 14 – Multizone conversion to <br />VAV Option S <br />ECM 15 – Update Delta Software n/a** <br />ECM 16 – BAS Event Schedule <br />Integration Option S <br />ECM 20 – Analytics Planner n/a** <br />* Verify new chiller plant sequencing over the course of 1st year of M&V <br />** No guaranteed savings associated with this ECM <br />DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907