Laserfiche WebLink
<br /> <br /> 9 <br /> <br /> <br />Education <br />Northern Illinois University <br />MS, Data Analytics <br />Missouri State University <br />BS, Construction Management <br />Certifications <br />Certified M & V Professional <br />Certified Energy Manager <br />Certified Energy Auditor <br />LEED Accredited Professional <br />Professional Experience <br />Ameresco, Inc. 2012 - present <br />Manager – Performance Assurance <br />2018-present <br />Measurement & Verification Team <br />Leader 2016-2018 <br />Senior Measurement & Verification <br />Specialist 2012-2016 <br />CTS Group 2009-2012 <br />Measurement & Verification Specialist <br />Schneider Electric Energy Solutions <br />2008-2009 <br />Project Development Engineer <br />South Bend Project Role <br />Performance Assurance Management <br />Jared Hughes, CMVP, CEM, CEA, LEED-AP <br />Manager – Performance Assurance <br />Project Role <br />Mr. Hughes has over 16 years of experience in performance <br />contracting, including developing ECMs, building whole facility <br />energy models, developing scope, calculating energy savings, <br />and performing energy audits of facilities of various sizes. He is <br />an expert in Measurement & Verification (M&V) for projects of <br />various sizes in numerous types of buildings using metering, <br />software, and data analytics to monitor project results. <br />Mr. Hughes creates M&V plans for projects, performs risk reviews <br />of energy calculations and energy models, ensures energy <br />conservation strategies are implemented properly, and collects <br />and analyzes data to verify that the savings targets are exceeded. <br />He also assists with development of M&V commissioning, pre- <br />installation documentation, and oversees annual M&V inspections <br />and reports. <br />Project Experience <br />Troy CCSD 30-C | Role: Performance <br />Assurance Summary: Multi-phase ESPC, with <br />rooftop solar PV at 6 schools, 2.2MW, with <br />BESS <br />$17,977,5525 <br />Olympia CUSD 16 | Role: Performance <br />Assurance Summary: Multi-Phase ESPC, roof <br />analysis and repair, rooftop & ground mount <br />solar PV at 4 schools, 1.49MW <br />$5,000,000 <br />City of Hutchinson, MN | Role: Performance <br />Assurance Summary: ESPC solar PV at <br />WWTP updated lighting systems at16 of the <br />City’s buildings, variable speed motors controls <br />implemented at the City’s Wastewater <br />Treatment Facility and integrated with the <br />existing SCADA control system for fully <br />automated monitoring and adjustment based <br />on current flow and load. <br /> $1,800,000 <br />Minneapolis Airports Commission (MAC) <br />Role: Performance Assurance Summary: 4.3 <br />MW custom superstructure mounted on tope of <br />terminal 1 & 2 garages, 8 EV charging <br />stations, 12,632 light fixtures converted to LED <br />$37,000,000 <br /> <br />