Community Hospital East, Indianapolis, IN <br />Owner <br />General Contractor <br />Size <br />Delivery Method <br />Contract Value <br />Start Date <br />Completion Date <br />Total Hours Worked <br />Industry Segment <br />Project Scope Summary <br />Not <br />Community Health Network <br />Pepper Construction <br />389,000 square feet <br />Subcontractor <br />$3.6 million ($5.1 million for Phase 1 and 2) <br />Spring 2016 <br />April 2017 <br />22,635 <br />Healthcare <br />Structural Demolition <br />X <br />U� RENASCENT <br />Demolition of the center third of on active hospital while protecting both the basement (under <br />the structure being demolished) that supports the power and communications of the hospital <br />and the structures on either side of the demolition, all within the project limits. Included o <br />5-story building separation. <br />Renascent: Experts in Demolition" <br />