Laserfiche WebLink
X <br />IUH Bloomington Hospital, Bloomington, IN <br />d <br />■ <br />Owner <br />General Contractor <br />Size <br />Delivery Method <br />Contract Value <br />Start Date <br />Completion Date <br />Recycle Rate <br />Industry Segment <br />Project Scope Summary <br />IU Health, DLZ Owners Rep <br />Renascent Inc. <br />590,000 square feet / 5 stories <br />Prime <br />$6.22 million <br />April 2022 <br />June 2023 <br />90% <br />Healthcare <br />Abatement, Structural Demolition, Site Work, Selective <br />Structural Demo around historic Kohr Building <br />a <br />If <br />Abatement and total structural demolition of the former IUH Bloomington Legacy Hospital. <br />Had to disconnect from and protect historic Kohr Building. The original tower was built in the <br />early 1960s, with additions as late as 2001. Renascent focused on dismantling the newer <br />portions first while keeping the older black mastic portions separate to minimize landfill <br />use. After demolition was completed, the city of Bloomington began development of a new <br />neighborhood in the space. <br />Renascent: Experts in Demolition" <br />