My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Dore & Assoc., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Dore & Assoc., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:03:55 PM
Creation date
5/28/2024 3:02:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Champion Paper Company, Hamilton, Ohio - Abatement and demolition of a 3-story, 175,000 5F <br />manufacturing facility. At one point In this structures history, locomotives were produced resulting in <br />massive below grade concrete machine pads that had to be excavated, The heavy duty building was <br />constructed of steel and concrete which was recycled and crushed on site, Contract amount; <br />$625,000,00 <br />YMCA, Port Huron, Michigan --As part of a 4 building abatement and demolition project, the 5-story, <br />riverfront structure was demolished and returned to green space, This building was a community <br />landmark for decades, Along with this building, a large Jail facility and 2 administrative buildings were <br />also removed, Contract amount; $615,000.00 <br />Indiana University, Gary, Indiana — In the center of campus was a fine arts and administration building <br />that were 4 stories tall requiring a "surgical" type extraction, The land was reverted back to green space <br />for the University, Not only was this project 100% safe, it was on time and within budget. Contract <br />amount; $650,000.00 <br />Detroit Foundry, Detroit, Michigan -- Extensive environmental clean-up was involved with this <br />demolition of the 200,000 SF Industrial structure. Over 60,000 cubic yards of foundry sand had to be <br />remedlated along with asbestos containing materials. The site was one of 4 projects removed for the <br />City of Detroit under the same contract. All sites were returned to green space. Contract amount; <br />$ 2, 000, 000,00,00 <br />CERTIFICATIONS <br />40-hour Haz-wopper <br />Confined Space Training <br />CPR/Flrst Aid <br />Asbestos Abatement Supervisor- Licensed in Multiple States <br />OSHA 30 Hour <br />Storm Water Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.