My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Adamo Demolition Co.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Adamo Demolition Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:02:35 PM
Creation date
5/28/2024 3:02:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Text box
ID:
1
Creator:
Created:
5/28/2024 3:02 PM
Modified:
5/28/2024 3:02 PM
Text:
mailto:sampson.hooper@aam.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
American Axle & Manufacturing <br />Detroit Manufacturing Complex Decommissioning, Decontamination & <br />Demolition <br />This project, located in Detroit, Michigan was for the sale of all assets, plant <br />decommissioning, decontamination and demolition of the 1.6M sf manufacturing facility. <br />The work included asbestos abatement, universal waste removal, demolition of multiple <br />structures of varying heights and the installation of new perimeter fencing to secure the <br />site. <br />Adamo purchased the <br />project from the <br />Owner, exclusive of the <br />land. <br />There was a fee paid to <br />the Owner at the <br />outset of the project <br />with a guarantee of <br />completion with no <br />fees to the Owner. <br />The project produced <br />very little in the way of debris. All non-ferrous metals, 2.5M pounds and ferrous metals, <br />30,000 tons, were recycled and the concrete produced by the demolition was crushed <br />onsite by Adamo and used as fill in machine pits, trenches and other voids on the site. <br />The work was completed ahead of schedule. <br />Adamo’s key personnel for the <br />project were Project Executive, <br />Rick Cuppetilli, Project Manager <br />and Superintendents Ray Scully, <br />Dan Stewart and Odie Danneels. <br />The project Owner contact is <br />Sampson Hooper who can be <br />reached at 1840 Holbrook Ave., <br />Detroit, MI 48212, and via e-mail <br />at sampson.hooper@aam.com <br />or by phone at (313)758-4740.
The URL can be used to link to this page
Your browser does not support the video tag.