My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Adamo Demolition Co.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Demolition of South Bend Medical Foundation Proj No. 123-076 - Adamo Demolition Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:02:35 PM
Creation date
5/28/2024 3:02:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GM WTC (Warren Technology Center) 2020 <br />VEC TRANSFORMATION <br />This project was <br />located in Warren, <br />Michigan at General <br />Motors Technology <br />Center. This project <br />consisted of <br />abatement and <br />complete demolition of <br />three (3) research <br />buildings, totaling <br />110,000 square feet. <br />One of the buildings <br />was known for its use <br />of research on high <br />speed car crash tests <br />using animals as test <br />dummies. More than <br />25 years ago, PETA’s <br />intense campaign essentially ended the automotive industry’s cruel practice of smashing <br />live animals into walls at high speeds as part of deadly and barbaric car-crash testing. <br />Time was of the essence in <br />the execution of this project. <br />Therefore, sufficient labor <br />and materials were provided <br />at all times to meet the <br />project schedule. The <br />schedule was based on <br />seven (7) 12 hour days. <br />Precautions were taken as to <br />not disturb the ongoing <br />business and to keep <br />vehicle, pedestrian, and <br />construction dirt and dust <br />out of occupied building <br />areas, lobbies, hallways and <br />passenger elevators. Approximately 1,000 gross tons (GT) of ferrous scrap was <br />removed from the properties. This project was completed in six (6) weeks, with a <br />contract value of $4,046,854.58.
The URL can be used to link to this page
Your browser does not support the video tag.