B. Additions: <br />1. The project will have a completion date of 20 December 2024 for <br />all work. The contract time will start when the Notice to Proceed is delivered and signed. <br />2. The City, Architect, and Contractor will hold a pre -construction meeting following award of <br />the contract. The date of the Notice to Proceed will be agreed at that meeting. <br />3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. <br />XIV. CHANGE OF CONTRACT TIME <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 <br />B. Additions: <br />The Contract Time may only be changed by Change Order. Any Claim for an extension <br />in the Contract Time shall be based on written notice delivered to the Department of <br />Public Works within seven (7) calendar days of the occurrence of the event giving rise to <br />the claim. Notice of the extent of the claim with supporting data shall be delivered within <br />fourteen (14) calendar days after such occurrence unless an official of the Public Works <br />Department allows an additional period of time to ascertain more accurate data. The <br />Contract Time will be extended in an amount equal to time lost to delays beyond the <br />control of the Contractor if a claim is made in accordance with this provision. Such <br />delays shall include acts of neglect by the Public Works employees, or to fires, flood, <br />labor disputes, epidemics, abnormal weather conditions, governmental procedures, or <br />acts of God. <br />2. Unless otherwise provided, the Contract time is based upon normal weather conditions. <br />An extension is granted for weather conditions significantly more severe than normal if <br />the Contractor demonstrates to the satisfaction of the City that the delay in the progress <br />of the work was due to such weather. The basis to define normal weather with be the <br />data compiled by the United States Department of Commerce, National Oceanic and <br />Atmospheric Administration (NOAA). <br />3. No extension of time will be granted if the Contractor, by his/her/its own action or <br />inaction, including fault or negligence of Contractor's subcontractors, caused the delay, or <br />for which any remedies are provided under any other provision of this agreement. <br />4. The grant of an extension of time under this Section in no way constitutes a waiver by the <br />City of any rights or remedies existing under this contract at law or in equity. <br />XV. DEFAULT AND TERMINATION <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 108 <br />B. Additions: <br />1. Events of Default shall include Contractor's failure to perform any of its obligations under <br />this contract including failure to commence work at the time specified, failure to perform <br />the work in accordance with these specifications, unauthorized discontinuation of the <br />work, failure to carry out the work in a manner acceptable to the City, failure to observe <br />Federal, State, or local laws or regulations, and failure to comply with any other term of <br />this contract. <br />Version 07/19/2023 Special Provisions - 5 <br />