Laserfiche WebLink
8.If the above question is not allowed for the base bid, can the contractor be allowed to <br />provide the cost savings to the owner as a voluntary alternate on the bid form? <br />a.No. <br />9.Since we are to leave the North and East basement walls in place, can we leave a <br />portion or all of the basement slab on grade and foundations in place in order to <br />maintain structural support and punch holes in the slab for drainage? <br />a.No. <br />10.Please confirm that the collection and disposal of glycol, which is considered hazardous <br />in some states but not a universal waste, is to be included and billed against the <br />$100,000 allowance identified in the addenda bid documents. <br />a.Confirmed as allowable.