Laserfiche WebLink
RealAmerica <br />Engineer's Estimate of ROW Cost <br />Diamond View Apartments <br />March 28, 2024 <br />Description Quantity Unit Unit Price Cost <br />1. Construction Engineering 1 LS 1.5% $4,250.00 <br />2. Mobilization/Demobilization 1 LS 5.0% $13,490.00 <br />3. Maintenance of Traffic 1 LS $30,000.00 $30,000.00 <br />4. Erosion Control 1 LS $15,000.00 $15,000.00 <br />5. Clearing Right of Way 1 LS $20,000.00 $20,000.00 <br />6. Tree, 6", Remove 10 EA $800.00 $8,000.00 <br />7. Concrete Curb and Gutter, Remove 720 LFT $15.00 $10,800.00 <br />8. Concrete Approaches and Sidewalk, Remove 891 SYD $20.00 $17,820.00 <br />9. Compacted Aggregate, No. 53 468 TON $50.00 $23,400.00 <br />10. HMA Surface 40 TON $120.00 $4,800.00 <br />11. HMA Intermediate 61 TON $110.00 $6,710.00 <br />12. HMA Base 61 TON $95.00 $5,795.00 <br />13. PCCP for Approaches, 6"71 SYD $140.00 $9,940.00 <br />14. Concrete Curb and Gutter 720 LFT $45.00 $32,400.00 <br />15. Concrete Sidewalk, 4"480 SYD $70.00 $33,600.00 <br />16. Sodding 4,450 SYD $6.50 $28,925.00 <br />17. Street Tree 9 EA $600.00 $5,400.00 <br />18. Tree Protection 9 EA $200.00 $1,800.00 <br />19. Irrigation Allowance 1 LS $15,000.00 $15,000.00 <br />20. Line, Solid, White, 6"234 LFT $2.00 $468.00 <br />Cost Estimate: $287,598.00 <br />125.00% $359,497.50 <br />Page 1 of 1