My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - SBFD Central Station & Services – WDi Architecture, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - SBFD Central Station & Services – WDi Architecture, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 4:21:10 PM
Creation date
5/14/2024 4:20:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 5 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br /> <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated 5/14,2024. <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $137,090 based on the following estimated distribution of <br />compensation: <br />a. Task 1: SBFD Central Roof Replacement <br />1) Conceptual Design $6,780.00 <br />2) Design Development $11,300.00 <br />3) Initial Construction Documents $13,560.00 <br />4) Bid Set Construction Documents $4,520.00 <br />5) Construction Manager Pricing $2,260.00 <br />6) Construction Phase Assistance $6,780.00 <br />7) TOTAL: $45,200 <br /> <br />b. Task 2: Public Works Service Center Roof Replacement <br />1) Conceptual Design $13,783.50 <br />2) Design Development $22,972.50 <br />3) Initial Construction Documents $27,567.00 <br />4) Bid Set Construction Documents $9,189.00 <br />5) Construction Manager Pricing $4,594.50 <br />6) Construction Phase Assistance $13,783.50 <br />7) TOTAL: $91,890 <br /> <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner.
The URL can be used to link to this page
Your browser does not support the video tag.