My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - High Street Sidewalk Improvements Proj No. 123-012 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - High Street Sidewalk Improvements Proj No. 123-012 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:55:45 PM
Creation date
5/14/2024 3:52:31 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CCNDITHONS <br />Concerning the Attached Quotation <br />Quote Number: Highside <br />STANDARD NOTATIONS, <br />1. Special note concerning seeding: Slusser's will install seed year-round. However, we will not guarantee <br />seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this <br />period is very risky due to extreme climatic conditions (heat/drought/cold/etc,) This note does not apply <br />to prairie or wetland seeding unless specified otherwise. <br />2. This quote is valid for a period of 60 days. <br />3. Lawn maintenance to include mowing or spraying is not included in this quotation. <br />4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. <br />5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices. <br />6, Performance & Payment bonds are available but not included in this quotation. <br />7. Clearing, grubbing, removal of rocks, debris and existing vegetation is not included in this quotation. <br />8. Seeding or sodding off right-of-way or outside of the construction limits is not included in this quotation. <br />9. Inorganic and Organic soil amendments are not included in this quotation. <br />10. Sodding, Nursery partial price does not include topsoil, topsoil placement, ground preparation or notching. <br />11. Sodding, Nursery partial price includes supplying and installing 100% Kentucky Bluegrass variety sod and <br />watering for 30 days. <br />12, Optional ground prep price for sodding does not include topsoil, topsoil placement, grading, or removal <br />of existing vegetation. <br />13. Optional ground prep price for sodding includes sod notching, fine raking, knocking down dirt clods, and <br />removal of rocks only. <br />14. Warranty or maintenance bond for sodding is not included in this quotation. <br />15. 1 year warranty or 1 year maintenance for sodding is not included in this quotation. <br />16. Indiana State Sales Tax has not been included in pricing. <br />17. Traffic control is the responsibility of the contractor/owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.