Laserfiche WebLink
5.Vendor personnel shall not unload any filled cylinders or ton containers prior <br />to live inspection by South Bend Wastewater personnel. <br />6.Vendor personnel shall assist South Bend personnel in the visual inspection of <br />each ton container for: <br />a)External damage or defect <br />b)Proper installation of valve protection housing or caps <br />c)Visual inspection of valves and fusible plugs <br />i)All old wire from previous hung tags are to be removed prior to delivery <br />ii)All fusible plugs should be defect free (no pits or holes ) <br />d.) Determination of markings of retest and recertification <br />i.Wastewater facility has overhead crane for offloading ton containers.