Laserfiche WebLink
3. SULFUR DIOXIDE <br />GENERAL <br />i. Sulfur quotes should be deposit -free. No cylinder deposit should be <br />included in the quote. <br />ii. All bid prices must be honored for no less than 4 months, even in <br />force majeure conditions. <br />PROPERTIES <br />Boilin Point <br />-10°C <br />Color <br />Colorless <br />Specific Gravity <br />80°F <br />1.363 <br />Critical Temp. <br />314082OF <br />Critical Pressure <br />1141.5 PSIA <br />USAGE <br />i. Estimated annual usage is 100 tons, more or less, to be delivered in 2,000 lb <br />containers of liquid SOa in truckload lots of 10 containers. <br />DELIVERY <br />i. Supplier must be able to guarantee delivery of up to 8 tons (20,000 lbs) within <br />three (3) to five (5) calendar days from release of requirement. <br />ii. Material to be delivered F.O.B. <br />No freight surcharges allowed. <br />iv. Billing must be submitted on a CWT unit basis. <br />v. Delivery Location: Wastewater Treatment Plant located at 3113 Riverside <br />Drive, South Bend, Indiana 46628. <br />