Laserfiche WebLink
1. CHLORINE SPECIFICATIONS <br />TON CYLINDERS <br />A. GENERAL <br />1. Only containers which currently are authorized by regulation for chlorine, <br />which have been inspected and reconditioned as described herein, and which <br />have been tested within the period required by regulations should be filled. It <br />is illegal to ship chlorine containers that have been filled by or without the <br />consent of the owner. <br />2. Due to the volatile nature of this chemical, the chlorine provider must be <br />able to have one (1) accredited Safety and Handling of Chlorine class per <br />year for South Bend Personnel. <br />3. Chlorine quotes should be deposit -free. No cylinder deposit should be <br />included in the quote. <br />4. All bid prices must be honored for no less than 4 months, even in force <br />majeure conditions. <br />Bonin Point <br />-29.29°F-34.05°C <br />Critical Density <br />35.77 lb./cu. ft. <br />Critical Pressure <br />111.8.4 psia 76.1 Atmos. <br />Critical Temperature <br />291420° 144.0C <br />Critical Volume <br />0.02796 cu. ft./lb. <br />Latent Heat of Vaporization <br />123.7 Btu./lb. Boiling point <br />Liquid Gas Relationship: <br />1 volume liquid chlorine = wt. at <br />457.6 volumes of chlorine, 825 @ <br />standard conditions <br />Melting Point <br />449.760F 400.980C <br />Specific Gravity - Dry Gas <br />2.482 <br />Specific Gravity — Liquid <br />1 1.468(° - 40C <br />B. Chlorine Ton Containers <br />a) All ton containers must be compatible with Chlorine Institute Emergency Kit "B" <br />2. Ton Container Types <br />a) Chlorine ton container types must comply with DOT spec. 106ASOOX, DOT or <br />ICC 106A500, 27, BE27. <br />b) Ton Container Valve and Fuse Plug Opening Threads <br />c) The threads in new ton containers are 3/4-14NGT (CI). <br />3. Valve Protection <br />