My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2024 Lead Service Line Replacements NW & SW Zones Proj No. 123-069C - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - 2024 Lead Service Line Replacements NW & SW Zones Proj No. 123-069C - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:26:12 AM
Creation date
5/14/2024 3:37:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SELGE CONSTRUCTION CO., INC. <br />COMPLETED PROJECT DESCRIPTIONS <br />Description: <br />Gravity Sanitary Sewer Connection —Rolling Prairie Elementary School (749) — Owner: <br />Rolling Prairie United School District. Installation of 8" Gravity Sewer for 40OLF and associated <br />structures. $89,612.00. Completed: 2023. <br />Description: <br />Entrance Drainage Improvements (Potawatomi Zoo) (743) — Owner: Jones Petrie Raf mski. <br />Retention Pond excavation for storm water runoff. $123,264.00. Completed: 2023. <br />Description: <br />Big & Tall Sewer Extension (736) — Owner: City of Elkhart. Installation of new grinder tank <br />and 60OLF of 2" Low Pressure Sewer. $71,043.00. Completed: 2023. <br />Description: <br />Auten Road �Waterm ain Replacement (733) — Owner: City of South Bend. Installation of new <br />12" Watermain 1,000LF. $149,225.00. Completed: 2023. <br />Description: <br />Citywide Water Service Replacement — Zone 10 (718) — Owner: City of Benton Harbor. <br />Complete replacement of approximately 400 new water services. Including 1200OLF of <br />Trenchless installation. All Landscape and Restoration. $2,825,901.00. Completed: 2023. <br />Description: <br />NorthshorelEastshore Collection System (708) — Owner: Turkey Creels Regional Sewer <br />District. Installation of new gravity sewer system around lake. Installation of 10,OOOLF of 8" <br />Gravity sewer and associated structures. 2800LF of 4-8-inch Force main. Installation of new <br />pump stations and piping. All hard surface and restoration. $4,966,945.00. Completed: 2023. <br />Description: <br />CSO 18 Backwater Valve Replacement (707) — Owner: City of South Bend. Installation of <br />new back water check valve in existing structure. $124,980.00. Completed: 2023. <br />Description: <br />Lift Station 51, 52, 53 (699) — Owner: New Buffalo Township. Complete replacement and <br />installation of 3 new lift stations including wet well, valve vault, process and controls and all <br />restoration. $960,541.00. Completed: 2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.